How to Choose a Solar Battery Company in California
The right solar battery company for a California home is one that holds a license covering battery work, gives you the CPUC's Solar Consumer Protection Guide to sign, puts the battery's usable kWh, output and backed-up circuits in writing, and can show how it handles warranty claims. Brand and price come after those checks, not before.
That order matters because 'solar battery company' covers three different businesses. A manufacturer makes the battery and stands behind its product warranty. An installer designs the system, pulls the permit, wires it in and gets the utility's Permission to Operate. And in a lease or power purchase agreement, a third company may own the equipment on your wall. This page shows how to check each of them yourself, using the state's own tools.
If you are still deciding whether a battery fits your home, start with home battery storage in California.
Key facts
- CSLB battery rule
- Stayed by court order
- OAL approved the rule June 5, 2024; its effective date is stayed pending a San Diego County case. CSLB, checked Sept 23, 2026.
- C-46 battery limit in the rule
- 80 kWh
- A solar contractor may install a battery up to 80 kWh as incidental and supplemental to a PV system, under the adopted text.
- Consumer guide
- Version 4 (2025)
- Signature required with residential interconnection in PG&E, SCE and SDG&E territory. CPUC.
- Median home battery, 2025
- 13.5 kWh
- Mostly California data. LBNL 2026 data update.
Sources are listed at the foot of this page.
Three kinds of company, three kinds of promise
Start by naming who is responsible for what, because a sales pitch tends to blur it.
The manufacturer's promise is the product warranty on its spec sheet. Tesla's Powerwall 3 datasheet lists a 10-year warranty. Enphase's IQ Battery 5P data sheet lists a 15-year limited warranty or 6,000 cycles, with more than 60 percent capacity retained. FranklinWH's aPower 2 datasheet lists 15 years or 60 MWh of throughput.
The installer's promise is the workmanship: the wiring, the roof or wall penetrations, the permit, commissioning and the paperwork with your utility. Its warranty is whatever its contract says, and it is only as good as the company's ability to honor it.
If you lease the battery or buy its output, the financing company owns the equipment and its contract decides who fixes what. Ask each of them, in writing, who you call when the battery stops working in year six.
Check the license, and the class that covers batteries
The Contractors State License Board licenses California contractors, and the CPUC's consumer guide tells you to check the license, and the salesperson's Home Improvement Salesperson registration if they have one, on CSLB's website at cslb.ca.gov or by calling 800-321-CSLB (2752).
Which license class may install a battery has been disputed. CSLB defines a C-46 Solar Contractor as one who installs, modifies, maintains and repairs thermal and photovoltaic solar energy systems. In 2024 CSLB adopted a rule stating that a battery energy storage system is not part of a photovoltaic system, adding batteries to the C-10 electrical contractor's scope, and letting a C-46 contractor install a battery only as 'incidental and supplemental' to a solar installation and only up to 80 kWh. The Office of Administrative Law approved it on June 5, 2024, but CSLB says its effective date has been stayed by court order pending San Diego County Superior Court Case No. 27-2024-00029818-CU-TT-CTL.
You don't need to settle that case to protect yourself. Ask for the license number and classifications, confirm them on CSLB's site, and ask the contractor to write on the contract which classification covers the battery portion of the work.
The CPUC guide you have to sign
In PG&E, SCE and SDG&E territory, and for Bear Valley Electric, PacifiCorp and Liberty, a solar provider submitting an interconnection application for a residential customer must collect your initials and signature on the California Solar Consumer Protection Guide. The CPUC says you must be given time to read it before signing. Version 4 was published in 2025 and includes a section on combining solar with storage.
Treat the guide as a test of the company. One that hands it to you early and walks through it is behaving the way the CPUC intends. One that produces it for a signature at the end of the visit, or skips it for a 'battery-only' job, is telling you something about how the rest of the paperwork will go.
Program lists are not quality ratings
Two lists get quoted as endorsements, and neither is one.
The Self-Generation Incentive Program publishes an Approved SGIP Developer List, and the CPUC's SGIP page points applicants to it to find an installer. Being on it means the company can file SGIP applications. It says nothing about workmanship, and it only matters if you actually qualify for an open SGIP budget.
PG&E's $7,500 Permanent Battery Storage Rebate requires enrolling the battery in the Emergency Load Reduction Program through your battery provider, and PG&E names Tesla's Virtual Power Plant with PG&E, Enphase's Virtual Power Plant program and Sunrun's CalReady ELRP program as enrollment paths, with PG&E's Automated Response Technology program as the fallback. That tells you which enrollment route a given product uses. It doesn't make one installer better than another.
What a comparable battery quote shows
You can't compare two battery companies on a monthly payment. Ask every bidder for the same items.
The battery model, the number of units, and usable capacity in kWh, taken from the manufacturer's spec sheet. Continuous output in kW, which decides how many appliances run at once. Which circuits are backed up, and whether a backup gateway, switch or critical-loads panel is included. The operating mode it will be set to: backup reserve, self-consumption or time-of-use shifting. Whether the design is AC-coupled to existing solar or DC-coupled to new panels.
Then the paperwork: the permit, the utility interconnection application and Permission to Operate, a schedule for each, and the total installed price with any rebate shown as a separate, conditional line. If a quote assumes PG&E's outage rebate, it should also show how many qualifying outages your account has had.
If the company goes out of business
Installers do go out of business, so plan for it before you pay. The product warranty usually still runs to the manufacturer, but you need proof you own a registered unit.
Before final payment, get the serial numbers, the commissioning report, the warranty registration confirmation from the manufacturer, and your own login to the monitoring app. Ask whether the manufacturer will send its own service network or require a certified installer, and how you find one. Keep the permit final and the utility's Permission to Operate letter with those documents. A replacement contractor can pick up a system that has all of them. One that has none may start from scratch.
Free-battery offers: match them to a real program
Some Californians can get a battery at no charge, which is why 'free battery' pitches work. PG&E's Residential Storage Initiative installs a permanent battery at no charge for customers on EPSS circuits with five or more EPSS outages since January 1, 2024 who are enrolled in CARE, FERA, Medical Baseline or the Self-Identified Vulnerable program. PG&E says it contacts eligible customers by letter or email, and that its program partner, Resource Innovations, handles outreach.
If an offer doesn't trace back to a program like that, it is probably a lease, a subscription or a loan with the cost moved somewhere you can't see yet. Ask which program pays for it, then look that program up on the utility's own website.
What to verify before hiring a battery company, and where
| Check | Where to verify | What a good answer looks like |
|---|---|---|
| License and classification | CSLB license check at cslb.ca.gov or 800-321-2752 | Active license; contract names the class covering the battery work |
| Salesperson registration | CSLB Home Improvement Salesperson lookup | Registered, and the name matches the person you met |
| Consumer protection guide | CPUC California Solar Consumer Protection Guide, version 4 | Given to you early, with time to read before signing |
| Battery specs | Manufacturer's datasheet (e.g., Tesla, Enphase, FranklinWH) | Usable kWh, continuous kW and warranty terms match the quote |
| Rebate claims | PG&E rebate page; selfgenca.com program metrics | Shown as conditional, with your eligibility evidence |
| Handover documents | Your own records at final payment | Serial numbers, warranty registration, monitoring login, permit final, Permission to Operate |
When this is the wrong move
This checklist is for a homeowner buying or leasing a battery from a contractor. If your utility's own program is installing one at no charge, such as PG&E's Residential Storage Initiative, the program picks the contractor and many of these choices aren't yours to make.
It also isn't a legal opinion on which license class may do battery work while CSLB's 2024 rule is stayed. If a job is large, commercial, or near the 80 kWh line in that rule, ask CSLB directly.
And if you are choosing between batteries rather than companies, start with the product comparison, because the installer you hire will often follow from the product you pick.
Frequently asked questions
What license does a battery installer need in California?
A CSLB license. CSLB adopted a rule in 2024 adding battery energy storage systems to the C-10 electrical contractor's scope and letting a C-46 solar contractor install a battery up to 80 kWh only as incidental and supplemental to a solar installation. CSLB says the rule's effective date is stayed by court order pending a San Diego County case, so ask the contractor which classification covers the battery and check it on CSLB's site.
How do I find a solar battery installer near me?
Get more than one bid, and check each company's license and classification on CSLB's website before you compare prices. If you are applying for SGIP, the program's Approved SGIP Developer List shows which companies can file an application. Manufacturer programs can tell you who is certified for a specific battery.
Is the battery warranty from the installer or the manufacturer?
Usually both, for different things. The product warranty comes from the manufacturer: 10 years on Tesla's Powerwall 3 datasheet, 15 years or 6,000 cycles on Enphase's IQ Battery 5P data sheet, 15 years or 60 MWh on FranklinWH's aPower 2 datasheet. The workmanship warranty comes from the installer's contract.
Does a battery-only job need the CPUC consumer guide?
The CPUC's requirement is tied to solar providers submitting residential interconnection applications. A battery added to solar usually goes through interconnection with the utility, so ask the company whether it will provide the guide, and read it either way. It includes a section on combining solar with storage.
Can a solar battery company promise a PG&E rebate?
It can tell you what the rebate requires, but only PG&E decides eligibility. The $7,500 Permanent Battery Storage Rebate needs five or more Wildfire Safety outages on your account since January 1, 2024, among other conditions, and PG&E funds it first come, first served.
The bottom line
Pick the company after you have checked three things yourself: a CSLB license whose classification covers the battery work, a CPUC consumer guide handed over with time to read it, and a quote that states usable kWh, continuous kW, backed-up circuits and the full installed price with any rebate shown as conditional. Then keep the serial numbers, warranty registration and your own monitoring login, so the battery outlives the company if it has to.
Want to discuss your solar options?
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. California Rate Relief collects the information for a solar referral; the provider confirms availability, design and price.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.
Related reading
Sources
Rates and incentive programs change. Each figure above traces to one of these.
- CSLB: Laws and Regulations (Battery Energy Storage Systems rulemaking) cslb.ca.govverified Sep 23, 2026 — OAL approval June 5, 2024; effective date stayed by court order, San Diego County Superior Court Case No. 27-2024-00029818-CU-TT-CTL
- CSLB: BESS final approved language (Order of Adoption) cslb.ca.govverified Sep 23, 2026 — C-10 scope includes battery energy storage systems; C-46 limited to incidental and supplemental batteries up to 80 kWh
- CSLB: C-46 Solar Contractor classification cslb.ca.govverified Sep 23, 2026 — C-46 definition
- CPUC: California Solar Consumer Protection Guide cpuc.ca.govverified Sep 23, 2026 — Signature requirement by territory, version 4 (2025), storage section, CSLB license and HIS check
- CPUC: Self-Generation Incentive Program cpuc.ca.govverified Sep 23, 2026 — Approved SGIP Developer List as the way to find an installer
- SGIP: Approved Developer List selfgenca.comverified Sep 23, 2026 — Existence and purpose of the developer list
- PG&E: Permanent Battery Storage Rebate pge.comverified Sep 23, 2026 — ELRP enrollment paths named by PG&E; outage condition
- PG&E: Residential Storage Initiative pge.comverified Sep 23, 2026 — No-charge battery eligibility, outreach by letter or email and Resource Innovations
- Tesla: Powerwall 3 Datasheet energylibrary.tesla.comverified Sep 23, 2026 — 10-year warranty (spec-sheet fact)
- Enphase: IQ Battery 5P data sheet (DSH-00010-11.0-EN, 2025-05-06) enphase.comverified Sep 23, 2026 — 15-year or 6,000-cycle limited warranty at over 60% capacity (spec-sheet fact)
- FranklinWH: aPower 2 datasheet franklinwh.comverified Sep 23, 2026 — 15-year or 60 MWh warranty (spec-sheet fact)
- Lawrence Berkeley National Laboratory: Distributed Solar and Storage, 2026 Data Update emp.lbl.govverified Sep 23, 2026 — Median residential battery size of 13.5 kWh in 2025, mostly California data