Independent information and referral site. Not a utility, contractor or government agency. Figures link to their sources. How we make money
California solar decisions
Solar companies in California: how to find, compare and verify an installer
There is no single best solar company in California. The right one is a licensed contractor that will do the work on your roof, under your utility’s current billing rules, at a price you can compare line by line with at least two other bids. Find companies through your city guide below, check each license with the state, then put the quotes side by side.
California Rate Relief is a private solar referral service.
Key facts
- Licenses that cover solar work
- C-46 or C-10
- CSLB’s C-46 Solar and C-10 Electrical classifications both name photovoltaic work.
- CSLBchecked Sep 23, 2026
- Largest legal down payment
- $1,000 or 10%
- Whichever is less, on a home improvement contract.
- CSLBchecked Sep 23, 2026
Find solar companies near you: 140 California city guides
A search for “solar installers near me” is really a question about your utility, your permit office and the companies that work in your area. Each city guide below covers those local details: which utility or community choice aggregator bills the account, what the local permit process asks for, and what to check in a quote there. Pick the closest city. If yours is not listed, start with the nearest one in the same county, then confirm your own utility and permit office.
The utility named next to each city is the one that city’s guide records. Some cities are split between utilities, so check the provider printed on your own bill.
Counties and regions
Los Angeles County
- Los Angeles · LADWP
- Long Beach · SCE
- Pasadena · PWP
- Glendale · GWP
- Santa Clarita · SCE
- Lakewood · SCE
Orange County
- Anaheim · Anaheim Public Utilities
- Irvine · SCE
- Santa Ana · SCE
- Huntington Beach · SCE
- Westminster · SCE
- San Clemente · SDG&E
Inland Empire: Riverside County
- Riverside · RPU or SCE where applicable
- Moreno Valley · MVU or SCE
- Temecula · SCE
- Murrieta · SCE
- Menifee · SCE
- Lake Elsinore · SCE
- Wildomar · SCE
- Hemet · SCE
- San Jacinto · SCE
- Perris · SCE
- Palm Springs · SCE
- Palm Desert · SCE or IID
Inland Empire: San Bernardino County
- San Bernardino · SCE
- Fontana · SCE
- Rancho Cucamonga · SCE
- Redlands · SCE
- Victorville · SCE
Ventura County
- Thousand Oaks · SCE
- Simi Valley · SCE
- Camarillo · SCE
- Ventura · SCE
San Francisco Bay Area
- San Francisco · PG&E
- Oakland · PG&E
- San Jose · PG&E
- Fremont · PG&E
- Hayward · PG&E
- Pleasanton · PG&E
- Livermore · PG&E
- Richmond · PG&E
- San Mateo · PG&E
- Half Moon Bay · PG&E
- Sunnyvale · PG&E
- Mountain View · PG&E
North Bay
- Santa Rosa · PG&E
- Petaluma · PG&E
- Sonoma · PG&E
Sacramento Valley and Sierra foothills
- Sacramento · SMUD
- Roseville · Roseville Electric
- Rocklin · PG&E
- Grass Valley · PG&E
- Chico · PG&E
San Joaquin Valley
Central Coast
- Santa Cruz · PG&E
- San Luis Obispo · PG&E
- Santa Barbara · SCE
More California cities
- Winchester · SCE
- Corona · Corona Electric or SCE
- Beaumont · SCE
- Monterey · PG&E
- Manteca · PG&E
- San Diego · SDG&E
- Chula Vista · SDG&E
- Encinitas · SDG&E
- Carlsbad · SDG&E
- El Dorado Hills · PG&E
- Oceanside · SDG&E
- Seaside · PG&E
- Watsonville · PG&E
- Aptos · PG&E
- Salinas · PG&E
- Walnut Creek · PG&E
- Rancho Cordova · SMUD
- Pacific Grove · PG&E
- Marina · PG&E
- Vallejo · PG&E
- Lancaster · SCE
- Newport Beach · SCE
- Palo Alto · CPAU
- Concord · PG&E
- Auburn · PG&E
- Lincoln · PG&E
- Vacaville · PG&E
- San Marcos · SDG&E
- Berkeley · PG&E
- Redding
- Yorba Linda · SCE
- Oxnard · SCE
- Scotts Valley · PG&E
- Cupertino · PG&E
- Santa Clara
- San Ramon · PG&E
- Santa Monica · SCE
- Ontario · SCE
- Bellflower · SCE
- Brentwood · PG&E
- Antioch · PG&E
- Novato · PG&E
- San Rafael · PG&E
- Napa · PG&E
- Fairfield · PG&E
- Tracy · PG&E
- Davis · PG&E
- Elk Grove · SMUD
- Galt · SMUD
- Clovis · PG&E
- Yuba City · PG&E
- Hollister · PG&E
- La Mesa · SDG&E
- Poway · SDG&E
- Santee · SDG&E
- La Habra · SCE
- Fullerton · SCE
- Aliso Viejo
- Mission Viejo
- Lake Forest · SCE
- Tustin · SCE
- Burbank
- Diamond Bar · SCE
- Downey · SCE
- Palmdale · SCE
- Hesperia · SCE
Searching by county or region instead of a city? Start with Orange County solar companies by city, Bay Area solar companies, San Mateo County solar companies, Riverside County, where the utility changes by city, High Desert solar companies, Kern County: PG&E and SCE areas, Coachella Valley solar companies: SCE or IID by city or Ventura County solar companies and permit offices.
Want the price side first? The solar cost guides by city cover what goes into a quote in 57 cities, and the statewide guide to solar panels in California covers cost, sizing and the current billing rules.
Solar installers near me: three state tools that list who works in your area
Search “solar companies near me” and Google usually leads with a map of nearby businesses. The map gives you names, not whether a company holds the right license or has finished jobs on your street. The CPUC’s consumer guide points homeowners to better starting lists, and each one takes a few minutes.
- Recent projects by ZIP code. The CPUC’s California DG Statistics site has a Find an Installer search. Type a ZIP code, city or county and it returns solar and storage projects interconnected in the last 24 months, with a cost per watt for each. Read the fine print: it covers only PG&E, SCE and SDG&E territory, the costs are “self-reported by applicants” with no further verification, and cost per watt is figured on the system’s AC capacity, while most quotes price the panels’ DC rating (CPUC DGStats, checked September 23, 2026). Use it to see which companies are active near you, not as a price you are owed.
- Licensed contractors by city. The CPUC guide tells homeowners to use the CSLB’s contractor search, enter their city and pick one of three license classifications: C-46 Solar, C-10 Electrical or B General Building (CPUC, checked September 23, 2026). The CSLB’s county-by-county contractor list does the same as a spreadsheet.
- Neighbors with a year of bills. The same guide suggests asking friends and neighbors who had solar installed at least a year ago whether they would use the company again, and why. A year covers a full cycle of summer surplus and winter shortfall, which is when estimates meet reality.
Take two or three names from any of these, run each through the license check below, and ask each for a quote built on the same checklist. Star ratings on a map can suggest questions to ask; they do not replace the contract or a current license lookup.
How to choose a solar company in California
The CPUC’s consumer guide gives the short version: get bids from at least three qualified solar providers, compare them and ask questions (CPUC, Solar Consumer Protection Guide, version 4, checked September 23, 2026). The steps below turn that into a routine you can run on any company, including ones this site has never reviewed.
- Start from your bill, not the sales pitch. Note your utility, your rate plan and twelve months of usage. PG&E, SCE and SDG&E customers who applied to interconnect on or after April 15, 2023 take service on the Net Billing Tariff, which credits exported power at values from the CPUC’s Avoided Cost Calculator, usually lower than what you pay to import (CPUC, checked September 23, 2026). City-run utilities such as LADWP and SMUD set their own rules. A quote built on the wrong tariff is a wrong quote.
- Collect three written bids. Ask every bidder for the same things: system size in kilowatts, panel and inverter models, a roof layout, monthly production after shading, the cash price, and the remaining utility bill. The checklist further down lists every line to request, and the guide to getting and comparing solar quotes covers where to ask and what each quote must come with.
- Find out who will actually do the work. The company that knocks on your door, runs an online ad or calls you may be a sales organization, a lead generator or a financier. Ask for the legal name and license number of the company that will install the system and the one that will service it.
- Verify the license and the salesperson. Look both up at the CSLB before a second meeting. The next section shows how.
- Read the contract’s front page. California requires a solar energy system disclosure document on the front or cover page of every residential solar contract, showing the total cost and payments including financing, how to complain and your cancellation rights, written in the language used in the sales presentation (CSLB, checked September 23, 2026).
- Choose how to pay last. Compare the cash price first, then the loan, lease or PPA built on the same system. Our comparison of cash, loan, lease and PPA terms shows what changes with each.
What separates a good solar bid from a weak one
Not the price by itself. The CPUC’s guide says the cheapest bid is not necessarily the best option, and that “a very low bid may indicate that a solar provider is trying to cut corners” (CPUC, checked September 23, 2026). The differences that matter show up in how the bid was built.
| Part of the bid | A stronger bid | A weaker bid |
|---|---|---|
| System size | Built from your last 12 months of use. The CPUC notes systems are typically sized to around 80–85% of the previous year’s use; on net billing, going above your history takes a signed attestation that your use will grow, with a ceiling of 150%. | Sized to “cover your whole bill” with no usage history attached. |
| Savings estimate | Matches the standardized bill savings estimate on the state’s Supporting Information form and shows the rate increase it assumes. The CPUC caps that assumption at 10% a year. | A verbal promise, or a projection whose rate assumption nobody will explain. |
| Price | A cash price, with solar, battery, roof and electrical work listed separately. | Only a monthly payment. |
| Who does the work | Names the installing company and its license number, and any subcontractor with its own. | Vague about whether the seller installs, or who it would hire. |
| Payment schedule | A down payment no larger than $1,000 or 10% of the price, whichever is less, and later payments that never run ahead of work done or materials delivered. | Large payments due before anything reaches your roof. |
| Schedule | An approximate start date and an estimated completion date written into the contract. | “As soon as we can get a crew out.” |
| Warranties and service | Separate terms for panels, inverters and labor, with the name of whoever honors each one. | A single “full warranty” line. |
Sizing, savings-estimate and subcontractor points: CPUC Solar Consumer Protection Guide, version 4. Payment and schedule rules: CSLB industry bulletin #20-22 (November 17, 2020). Both checked September 23, 2026.
One more test from the CPUC guide: ask each finalist for three customer references whose systems have been running for at least a year, then ask those owners who showed up when something needed fixing.
How to verify a solar installer’s license
The CSLB’s Check a License tool searches five ways: by contractor license number, business name, the name of a person on the license, a Home Improvement Salesperson (HIS) registration number, or a salesperson’s name. HIS numbers end in the letters “SP.” The database is offline from 8 p.m. Sunday to 6 a.m. Monday for maintenance (CSLB, checked September 23, 2026).
What to look for on the record:
- The right classification. The CSLB defines a C-46 Solar contractor as one who “installs, modifies, maintains, and repairs thermal and photovoltaic solar energy systems.” A C-10 Electrical contractor’s scope also names “solar photovoltaic cells.” Either can be appropriate for rooftop solar.
- An active status and a bond. A license does not issue without a $25,000 contractor bond and proof of workers’ compensation coverage or a valid exemption (CSLB, checked September 23, 2026).
- A matching name. The business name on the license must match the name on your contract. A similar name is not the same license.
- The salesperson, too. Anyone who solicits, sells, negotiates or executes home improvement contracts for a licensed contractor must register with the CSLB as a Home Improvement Salesperson (CSLB, checked September 23, 2026).
The full walkthrough, including the bond’s limits and the cancellation statutes, is in our guide on verifying a California solar contractor before you sign. If you only want to know what a licensed installer is and how to find one, start with finding a licensed solar installer.
Checking a solar company’s track record
A license check tells you a company may do the work. A record check tells you how it has done it. The CPUC’s guide suggests finding out how long a company has been in business and how many systems it has installed, and reading reviews on more than one site, “since some websites may not be neutral” (CPUC, checked September 23, 2026). Four places to look:
- The CSLB record itself. The CSLB describes its lookup as a way to verify license information “including complaint disclosure,” so read past the word “active” (CSLB, checked September 23, 2026).
- Court and bankruptcy filings. Several residential solar companies have filed for bankruptcy in recent years. Our page on solar companies in bankruptcy court and on the CSLB record lists the federal cases and how to search for one yourself.
- Better Business Bureau complaints, not the badge. Read the complaints and how the company answered them. BBB accreditation is a program the business pays for: the BBB states that it “charges a fee for BBB Accreditation” (BBB, checked September 23, 2026).
- Recent local jobs. The DGStats installer search above shows whether a company has interconnected projects near you in the last two years.
The bond, the complaint process and the cancellation statutes are covered step by step in the full contractor verification guide.
Accredited, certified or licensed: what each label means
Only one of these labels is required by law in California, and it is the license. The others are voluntary, which does not make them worthless. It means you have to know what each one measured.
| Label | Who grants it | What it tells you |
|---|---|---|
| Contractor license (C-46, C-10 or B) | Contractors State License Board | Required to install solar on a home. The CPUC guide says the license must be in one of these three classifications and that doing business without one is illegal. |
| NABCEP board certification | North American Board of Certified Energy Practitioners | A credential held by a person, not a company, earned by showing training and experience and passing an exam. It lasts three years, and renewing it takes 30 hours of continuing education. The CPUC calls NABCEP certification “a high standard in the industry.” |
| NABCEP company accreditation | NABCEP | A company program with staffing and policy benchmarks and at least three randomly selected inspections of finished installations. NABCEP’s list, checked September 23, 2026, named accredited companies in seven states and none in California. |
| BBB accreditation | Better Business Bureau | The business agrees to eight conduct standards, such as advertising honestly and honoring promises, and pays BBB a fee. It is not a license or a technical credential. |
| Equipment maker installer programs | Panel, inverter and battery manufacturers | Rules differ by maker. Ask what the program required and whether it changes the warranty you would get. |
So when a company calls itself an “accredited solar installer” in California, ask which of these it means and who holds it. If the answer is NABCEP, get the certified person’s name and whether that person will design or install your system; NABCEP publishes a directory of board-certified professionals. The CPUC guide treats a company that employs NABCEP-certified installers as “a good sign.” None of these labels replaces the license lookup (CPUC, NABCEP and BBB, checked September 23, 2026).
Installer, broker or lead generator: who are you dealing with?
Many companies that advertise as “solar providers” or “solar services” do not install anything. The CSLB drew the line in a 2020 industry bulletin. Lead generators and solar brokers may “serve as a referral source for licensed contractors, provide contractor contact information to prospective customers, and set up appointments.” They may not quote or offer a system, and they may not solicit, negotiate or sell contracts without the proper license or registration. The bulletin also states that installing a solar energy product is a “home improvement,” which only a licensed contractor can do (CSLB, checked September 23, 2026).
You will also meet “solar dealers” and “solar power suppliers.” In solar lending, the dealer is the company that sells the system and arranges the loan, whether or not its own crew puts it on the roof. The CFPB found that solar salespeople, installers and lenders often have agreements with each other, so sales, installation and financing can blend into one conversation (CFPB, Issue Spotlight: Solar Financing, August 7, 2024). Two questions from the CPUC’s list sort this out quickly: is the salesperson your employee, and will you subcontract the installation to another company? For what the arrangement can add to a loan, see how solar dealer fees work.
This site sits on the referral side of that line. California Rate Relief is a referral service. We are not a licensed contractor. How we are paid is on how we make money. For what a solar broker does and when using one makes sense, see what a solar broker is in California.
Who regulates solar companies in California?
| Agency | What it covers | When to contact it |
|---|---|---|
| Contractors State License Board (CSLB) | Contractor licenses, bonds, salesperson registration, contract rules | Before you sign, and for complaints about the work or the sale |
| California Public Utilities Commission (CPUC) | Net billing rules for PG&E, SCE and SDG&E; the solar consumer protection guide | Questions about export credits, interconnection or your utility bill |
| Department of Financial Protection and Innovation (DFPI) | PACE program administrators, licensed and regulated since 2019 | If the system is financed through your property tax bill |
| City or county building department | Permits and inspections | To confirm a permit was pulled and the work passed inspection |
PACE deserves a warning of its own. DFPI notes that the payments are added to your annual property tax bill and that PACE contracts “are signed financing agreements that are difficult to void” (DFPI, checked September 23, 2026). For the red flags in a solar contract itself, read the solar contract terms to question before signing.
National solar companies or a local installer?
Size tells you less than it seems. A national brand may sell mostly leases and power purchase agreements, and some work through local dealers, so the crew on your roof and the company that answers a service call may be different businesses. A small local installer may do everything in-house but carry less financing choice. Neither is automatically better. What matters is written in the contract: who installs, who services, what the warranty covers for your payment type, and what happens if the company stops operating.
That last point is not hypothetical: solar installers do go out of business, and the contract decides what you are left holding. Our guide to what survives when a solar installer goes bankrupt explains which warranties and contracts continue, and checking a company’s court and license record lists the residential solar bankruptcies on the federal docket.
Top-rated solar companies: how to read the lists and reviews
Lists of the “top,” “best” or “top rated” solar companies measure different things, and none of them measures your roof. Before you lean on one, ask three questions about it:
- What was counted? Installation volume rewards the biggest sellers, star averages reward whoever collects the most reviews, and editorial picks reflect whatever the editor weighted. A company can top one list and miss another.
- Who paid for it? Some publishers earn money from the companies they list. Ask. This site is one of those businesses: California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement, which is why the reviews here are alphabetical and unranked.
- Where and when? A national ranking says little about the crew that serves your county this year. The DGStats search above is the closest thing to a neutral local view, because it comes from utility interconnection records rather than marketing.
For reviews, the CPUC’s advice is to check several sites and look for a consistent picture. Read the one- and two-star reviews from the last year and the company’s replies: slow service visits, roof leaks at mounting points and billing surprises are the complaints that tell you what owning the system with that company would be like.
Solar roofing companies: who can do the roof and the panels?
A new roof and a solar system are two trades in California’s license system. The CSLB’s C-39 Roofing classification covers products that “seal, waterproof and weatherproof structures” and does not mention solar. The C-46 Solar classification lets its holder do other building trades only “when required to install a thermal or photovoltaic solar energy system” (CSLB, checked September 23, 2026). A general building contractor holding a B license can coordinate both through licensed subcontractors. So when one company sells you “roof plus solar,” ask which license covers each part of the job and look up both.
Order matters too. The CPUC’s guide says that if you plan to replace your roof soon, you should do it before the solar goes on, and it suggests asking who will do the roof work, what their license number is, what roof warranty comes with it, and roughly what it would cost to remove and reinstall the panels for a future roof job (CPUC, checked September 23, 2026). Our guides to whether your roof is ready for solar and “free roof replacement” solar offers cover the rest.
Solar company reviews and comparisons on this site
These reviews check what each company publishes about itself against public records: license numbers at the CSLB, court filings and the company’s own contract terms. The list is alphabetical and unranked. Inclusion does not mean a referral agreement exists with any of them. The full index is on the California solar company reviews page.
- Ameco Solar review: Los Angeles-area solar and roofing company
- Baker Electric / Baker Home Energy review: two San Diego entities with separate license numbers
- Elevation Solar review: what the contract says
- Empire Solar review: which entity you would actually hire
- Freedom Forever review: licenses, financing and its 2026 bankruptcy filing
- LA Solar Group review: in-house panels and a court-record check
- Momentum Solar review: whether it serves California
- New Day Solar review: Murrieta-based installer
- Option One Solar review: Apple Valley installer and its warranty terms
- Palmetto review: LightReach financing and the court record
- Powur review: a sales-network model and its complaint record
- Semper Solaris review: California solar, roofing and HVAC company
- Solar Optimum review: lawsuits, ratings and warranty
- Sullivan Solar Power review: a defunct San Diego installer and what owners can do
- Sunergy Solar review: ownership focus and reported delays
- Sunlux Solar review: warranty terms and the CSLB check
- Sunnova review: whether it is still in business
- SunPower review: the Complete Solaria rebrand
- Sunrun review: leases, PPAs and company status
- Tesla Solar review: panels, Powerwall and service
Head-to-head comparisons
- Sunrun vs SunPower
- Sunrun vs Tesla Solar
- Sunnova vs Sunrun
- Enphase vs SolarEdge inverters
- Sunrun lease vs PPA
- How a Sunrun buyout is calculated
Shopping for equipment rather than an installer? The solar panel brand reviews cover the modules themselves, and the home battery guide covers storage sizing and incentives.
Looking for SolarCity? It is part of Tesla. SolarCity’s own SEC filing records that it became a wholly owned subsidiary of Tesla on November 21, 2016, and Tesla’s support pages move former MySolarCity customers to a Tesla Account (SEC; Tesla, checked September 23, 2026). The Tesla Solar review covers what that company sells and services today. If you were searching for solar in California City, the Kern County town, the California City solar cost guide covers its utility and permit office.
Commercial and industrial (C&I) solar companies
“C&I” is industry shorthand for commercial and industrial customers: offices, warehouses, farms, schools and other businesses. Those projects are bought differently from a home system. Many run through an engineering, procurement and construction (EPC) firm, or a developer that may own the system and sell you the power. The license classes are the same (C-46, C-10 or B), but the home-sale rules on this page, such as salesperson registration and the solar disclosure document required on a residential solar contract, are written for homes (CSLB, checked September 23, 2026).
For a business project, start with commercial solar companies and EPCs in California, then how a solar developer differs from an installer and what commercial systems cost per watt.
Put the quotes on the same basis
A smaller monthly payment can hide a longer contract, less equipment or a larger remaining electric bill. Ask each bidder to fill the same gaps.
| Compare | Get it in writing |
|---|---|
| System and output | Same DC system size, module/inverter models and roof layout; monthly production with shading and losses shown. |
| Battery and backup | Usable kWh, continuous output, backed-up circuits, reserve setting and expected replacement costs. |
| Price and scope | Separate solar, battery, roof, panel upgrade, permits and interconnection. Compare cash prices before financing. |
| Utility bill | Same usage history and tariff; separate onsite use, grid imports, export credits and remaining fixed/delivery charges. |
| Contract and service | Who installs and who services it; written coverage by address, insurance, license record, exclusions and warranty claim process. |
| Payment and transfer | Cash, loan, lease or PPA; upfront costs, APR or escalator, total payments, home-sale and end-of-term terms. |
Can you install solar yourself in California?
The law allows it in limited cases. The owner-builder exemption in Business and Professions Code section 7044 covers owners who do the work themselves, or through their own employees paid wages, on a structure not intended for sale. For a principal residence the CSLB lists three conditions: the work is done before any sale, you lived in the home for the 12 months before the work is completed, and you have used the exemption on no more than two structures in any three-year period (CSLB, checked September 23, 2026). The CSLB also warns homeowners to be wary of unlicensed “consultants” who suggest owner-builder status as a way to save money. You still need the building permit and inspection, and your utility must approve the interconnection before the system is switched on.
How to become a solar contractor or start a solar company
The license comes first. To sit for a CSLB exam you need at least four years of journey-level experience in the classification, and up to three of those years can be credited from technical training, apprenticeship or education; at least one year must be practical experience (CSLB, checked September 23, 2026). The application processing fee is $450. Once you pass, the license issues after you file a $25,000 contractor bond, show workers’ compensation coverage or an exemption, and pay an initial license fee of $200 for a sole owner or $350 for other business types (CSLB, checked September 23, 2026). Anyone selling for you needs an HIS registration. The details are in our guide to the California solar contractor license.
The questions that come after choosing a company
- What the system should cost: solar panel cost and sizing in California, or run a quote through the bill and quote calculator.
- How the export credit works under current rules: NEM 2.0 versus the Net Billing Tariff.
- Which incentives still apply in 2026: California solar incentives and the federal credit.
- How long the process takes: the solar installation timeline from contract to switch-on.
- Sales tactics to walk away from: door-to-door solar sales and dealer fees hidden in financing.
- The official tools behind all of this, in one list: California solar resources.
- How to collect bids that line up: getting three comparable solar quotes.
Frequently asked questions
What is the best solar company in California?
There is no single best solar company for every California home, and this site does not publish a ranking. The best company for you is a licensed contractor that will install on your roof, under your utility’s current rules, at a price you can compare line by line with other bids. The CPUC’s consumer guide tells homeowners to get bids from at least three qualified solar providers, compare them and ask questions.
Who regulates solar companies in California?
Several agencies share the job. The Contractors State License Board licenses the contractors who install solar, registers home improvement salespeople and takes complaints. The CPUC sets the net billing rules for PG&E, SCE and SDG&E customers and publishes the solar consumer protection guide. The Department of Financial Protection and Innovation has licensed PACE program administrators since 2019. Your city or county building department issues the permit and inspects the work.
How many solar companies are there in California?
The CSLB does not publish a single count on its license-lookup pages. Its Public Data Portal lets anyone download the current list of licensees in a classification, such as C-46 Solar or C-10 Electrical, as a spreadsheet, and the CSLB notes that the list is current only on the day it is downloaded. Both classifications can install photovoltaic systems, so a count of C-46 licenses alone undercounts who can do the work.
How do I compare solar installation companies?
Ask each company to quote the same system size, equipment and roof layout, with the cash price, the solar, battery, roof and electrical work listed separately, and the remaining utility bill modeled on the same usage history and tariff. Then check each company’s license and the salesperson’s registration at the CSLB, and read the solar disclosure document that must sit on the front page of the contract.
Can I install my own solar panels in California?
California law has an owner-builder exemption (Business and Professions Code section 7044) for owners who do the work themselves or with their own employees on a structure not intended for sale. The CSLB lists conditions, such as living in the home for the 12 months before the work is completed. You still need the local building permit and inspection, and the utility has to approve the interconnection before the system can operate.
How do I become a licensed solar installer in California?
To qualify for the CSLB exam you need at least four years of journey-level experience in the classification, and up to three of those years can be credited from technical training, apprenticeship or education. The application fee is $450. Before the license issues you need a $25,000 contractor bond, workers’ compensation coverage or a valid exemption, and an initial license fee of $200 for a sole owner or $350 for other entities.
Do you need a license to sell solar in California?
Yes, in most cases. The CSLB says anyone who solicits, sells, negotiates or executes home improvement contracts for a licensed contractor must register as a Home Improvement Salesperson, and that selling home improvement goods and services without registering is a misdemeanor. A lead generator that only refers homeowners and sets appointments does not need to register, but it may not quote prices or negotiate contracts.
Where can I see which solar companies work in my ZIP code?
The CPUC’s California DG Statistics site has a Find an Installer search. Enter a ZIP code, city or county and it lists solar and storage projects interconnected in the last 24 months in PG&E, SCE and SDG&E territory, with each project’s cost per watt. The costs are self-reported by applicants and not verified. Customers of city-run utilities such as LADWP or SMUD are not covered.
Are there accredited solar installers in California?
No accreditation is required. What California requires is a CSLB contractor license in a class that covers solar, usually C-46, C-10 or B. Individual installers can hold a voluntary NABCEP board certification, which the CPUC’s consumer guide calls a good sign. NABCEP also accredits companies, but its accredited-company list on September 23, 2026 named companies in seven states and none in California.
What happened to SolarCity?
Tesla bought it. SolarCity’s SEC filing states that on November 21, 2016 it became a wholly owned subsidiary of Tesla. Tesla’s support pages tell former SolarCity customers to sign in with a Tesla Account, which lease and PPA customers use to pay their bills. For service, cost and warranty on a system sold today, read the Tesla Solar review. If you meant California City, the Kern County town, see its solar cost guide.
What does getting solar installed in California involve?
Six steps, in order: compare at least three bids; sign a contract, which has to carry the solar disclosure document on its front page and gives you at least three business days to cancel (five if you are 65 or older); a site visit and final design; a building permit from your city or county; installation and inspection; and written approval from your electricity provider to turn the system on. The CPUC suggests asking each company when it will start and finish and roughly how long the utility’s approval will take after installation.
Who designs a home solar system in California?
The contractor you sign with is responsible for the design, whether its own staff or an outside design firm draws the plans, and its license is on the contract. The design becomes the plan set your city or county reviews for the permit and the drawings the utility reviews before it approves the connection. Ask for the plan set and the production estimate it is based on, and check that the panel count and inverter match the contract.
What is the California Solar Consumer Protection Guide?
A CPUC document that explains your rights and the questions to ask before you sign; version 4 was published in 2025. Solar providers applying to interconnect residential customers of PG&E, SCE, SDG&E, Bear Valley Electric Service, PacifiCorp and Liberty must collect the customer’s initials and signature on it, and the CPUC says customers must be given time to read it before signing.
What fees come with going solar in California?
Beyond the system price, expect four kinds. Financing can carry a dealer fee built into the loan price. Permit fees and any utility interconnection charge should appear as their own lines in the bid. And the monthly utility bill does not go away: PG&E’s Base Services Charge, about $24 a month for most customers from March 2026, cannot be offset by solar generation credits, and SCE lists about $6 a month for CARE customers and about $12 for FERA. Ask every bidder to show these lines separately.
What warranties should a solar system in California come with? (¿Qué garantía debe tener?)
Ask about three, as the CPUC’s questions for solar providers do: warranties on the panels and inverters, including how long they last and whom you contact for a replacement; a warranty on the labor and construction; and, for a lease or PPA, any minimum energy guarantee and how you are compensated if the system produces less than the contract promises. Also ask whether an insurance policy comes with the system or whether you need to add it to your homeowner’s policy. Get every warranty in writing, with the name of the company that stands behind it.
Is California Rate Relief a solar company?
No. California Rate Relief is a referral service. We are not a licensed contractor. The company that designs, sells and installs your system is the one whose license belongs on the contract, and that license is the one to check.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.