California solar decisions
Solar Companies in San Diego, CA: Who Installed the Most Systems in 2025
Utility records show 5,137 home solar systems connected in San Diego in 2025. Sunrun Inc. was the installer of record on 880 of them, followed by Lennar (472) and Baker Electric, Inc. (342). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Permit
- Self-issued, no plan review
- Rooftop, 38.4 kW AC or less, IB-301 template
- City of San Diegochecked Sep 23, 2026
- Storage on the same permit
- Up to 38.4 kWh
- No single unit over 20 kWh
- City of San Diegochecked Sep 23, 2026
- SDG&E average rate
- 45.5 cents/kWh
- June 2026, highest of the three large utilities
- CPUC Public Advocates Officechecked Sep 23, 2026
Installers who connected the most home solar systems in San Diego in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Sunrun Inc. | 880 | 2,596 | 750184 check |
| Lennar | 472 | 857 | 1003498 check |
| Baker Electric, Inc. | 342 | 823 | 858088 check |
| Bright Planet Solar | 293 | 709 | 1020761 check |
| GAF Energy | 201 | 360 | 1062345 check |
| SunPower Corporation | 181 | 432 | 890895 check |
| Semper Solaris Construction Inc | 181 | 418 | 978152 check |
| Aloha Solar Power | 179 | 316 | 1066562 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in San Diego by the numbers
SDG&E approved 5,137 home solar systems in San Diego in 2025, from 286 installers; the top three were named on 33% of them. The busiest year since 2021 was 2023, with 13,742 (2025: -63%). Another 1,455 were approved from January through May 2026.
2025 mix: 36% leased or on a power purchase agreement, 64% owned by the household; 0% with a battery; median size 4.92 kW DC. San Diego County: 36% leased or PPA, 0% with a battery, median 5.36 kW.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 7,850 | 11,574 | 13,742 | 5,865 | 5,137 |
Hiring a solar company in San Diego
Most San Diego home solar needs no plan review: the City lets contractors self-issue a Residential Rooftop-Mounted Solar PV Permit for single-family homes, duplexes and townhouses up to 38.4 kW AC, with up to 38.4 kWh of storage and a panel upgrade up to 320 amps on the same permit. San Diego Community Power buys the city's electricity and SDG&E delivers it. Compare at least three written bids built on your own bill.
Start with your San Diego electricity bill
San Diego Community Power buys the electricity for most homes in the City of San Diego and SDG&E delivers it, on one SDG&E bill with Community Power as a line item. SDG&E's average residential rate, 45.5 cents per kWh in June 2026 by the Public Advocates Office's count, is the highest of the state's three large utilities, and most bills also carry a Base Services Charge of about $24 a month that solar does not reduce.
San Diego's self-issued solar permit
The City's Development Services Department no longer requires professional certification for residential rooftop solar. For a single-family home, duplex or townhouse designed per the template in Information Bulletin 301, the Residential Rooftop-Mounted Solar PV Permit is self-issued with no plan review, provided the system is no larger than 38.4 kW AC, needs no fire plan review or structural review under IB-301, and involves no work that calls for a combination building permit, such as changing the roof structure or adding a new structure. Solar shingles use the same permit.
Anything outside those limits takes a different permit. Solar on a structure other than a single-family home or duplex needs an electrical permit with plans; ground mounts more than 5 feet above the ground and projects requiring building modifications need a building permit. Applications are online, with PDF plans that must pass the City's upload validation, and fees depend on the project's scope under IB-301.
Community Power's rules for a new system
Community Power appears as a line item on the SDG&E bill, and it says that line is not an extra charge. For a new system, it says the Solar Billing Plan requires SDG&E's EV-TOU-5 time-of-use rate and credits exports at avoided-cost values rather than the retail price. Ask each bidder which hours its model assumes you export in.
SDG&E's Base Services Charge of about $24 a month, about $12 on FERA and $6 on CARE, pays for equipment such as meters and transformers and for customer service, and it stays whatever the system produces. The fair test for a San Diego proposal is your own twelve months of bills against what it says would remain, not SDG&E's 45.5-cent average.
What a San Diego quote needs to explain
| Check | Ask each bidder |
|---|---|
| Self-issued permit | Confirm the design follows the IB-301 template, stays at or under 38.4 kW AC and needs no fire or structural review. |
| Battery and panel limits | Keep storage at 38.4 kWh or less (each unit 20 kWh or less) and any panel upgrade at 320 amps or less, or say which permit applies instead. |
| Community Power and SDG&E | Model Community Power generation, SDG&E delivery and the EV-TOU-5 rate Community Power says the Solar Billing Plan requires. |
| Fixed charge | Leave SDG&E's Base Services Charge on the post-solar bill. |
A comparison to ask for
Two San Diego bids for the same house can land on different permits. A rooftop system with a battery of 38.4 kWh or less, in units of 20 kWh or less, and a panel upgrade of 320 amps or less can be self-issued; a larger battery, a roof framing change or a ground mount more than 5 feet high sends the job to a permit with plan review. Ask each bidder which permit its design needs.
Verify the company behind the San Diego quote
Match the business name and license number on each San Diego proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison. What you pay the utility today is on the San Diego rates and bills page.
Permit fees and the filing route are on the San Diego solar cost and permit page.
San Diego solar quote questions
Do I need plan review for solar in San Diego?
Not for most homes. A single-family, duplex or townhouse rooftop system designed to the IB-301 template, 38.4 kW AC or less and needing no fire or structural review, gets a self-issued Residential Rooftop-Mounted Solar PV Permit with no plan review.
Can a battery go on the same San Diego solar permit?
Yes, up to 38.4 kWh of storage with no single unit over 20 kWh, along with a panel upgrade of up to 320 amps and an inverter-integrated EV charger.
Who supplies electricity in San Diego?
San Diego Community Power supplies the generation for most homes in the city; SDG&E delivers the power and sends the bill, with Community Power shown as a line item.
Before you sign anything in San Diego
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.