    Solar Companies in Temecula, CA: Who Installed the Most Systems in 2025

    Utility records show 887 home solar systems connected in Temecula in 2025. Sunrun was the installer of record on 258 of them, followed by Solara Home Energy LLC (90) and Tesla Energy Operations Inc (53). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.

    California Rate Relief is a private solar referral service.

    Key facts

    Expedited review
    About 3 business days
    City Standard Plans; standard review is 10 to 12 days
    City of Temeculachecked Sep 23, 2026
    Battery in garage
    Only with fire sprinklers
    Temecula Fire Department requirement
    City of Temeculachecked Sep 23, 2026
    Utility split
    About 93% SCE, 7% SDG&E
    Share of the city's area
    California Energy Commissionchecked Sep 23, 2026

    Installers who connected the most home solar systems in Temecula in 2025

    Home solar systems per installer in Temecula, from utility interconnection records
    Installer (name as reported)Systems in 2025Jan 2024 to May 2026CSLB license
    Sunrun258555750184 check
    Solara Home Energy LLC901211103958 check
    Tesla Energy Operations Inc53142888104 check
    Bright Ops46781020761 check
    Sunnova Energy Corporation283541003498 check
    Energy Service Partners Inc DBA ESP Contracting2332619149 check
    Sunpower Corporation Systems22186890895 check
    New Day Solar2267812958 check

    Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).

    Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).

    Start with your bill

    Or tap a typical amount

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Home solar in Temecula by the numbers

    SCE approved 887 home solar systems in Temecula in 2025, from 103 installers; the top three were named on 45% of them. The busiest year since 2021 was 2023, with 1,991 (2025: -55%). Another 387 were approved from January through May 2026.

    2025 mix: 45% leased or on a power purchase agreement, 55% owned by the household; 75% with a battery; median size 7.2 kW DC. Riverside County: 57% leased or PPA, 75% with a battery, median 6.48 kW.

    Home solar systems connected per year in Temecula, 2021 to 2025
    Year20212022202320242025
    Systems connected1,2281,7771,9911,158887

    Hiring a solar company in Temecula

    Temecula gives solar companies three permit routes: SolarAPP+ with automatic issuance, an expedited 3-business-day review for City Standard Plans, and a 10-to-12-day standard review. SolarAPP+ jobs also need a Fire Department inspection first, and batteries cannot go in a garage without fire sprinklers. Most of Temecula is SCE territory, with a small part in SDG&E's. Compare at least three written bids built on your own bill.

    Start with your Temecula electricity bill

    Most of Temecula is Southern California Edison territory: the Energy Commission's map puts about 93% of the city's area in SCE's service area and about 7% in SDG&E's, with no community choice provider over either. The two utilities have different solar rules and rates, so confirm from your own bill which one serves your address before comparing any savings estimate.

    Temecula's SolarAPP+ steps

    SolarAPP+ has been available in Temecula since September 30, 2023. The City's list runs in order: confirm the project qualifies, register for a Citizen Self Service (CSS) account, obtain a City business license, have a valid state contractor's license ready, register with SolarAPP+ and submit the design there for a fee, then apply for the building permit in CSS under SolarAPP+ Photovoltaic with the approved plans uploaded, which carries its own fee.

    The last step is specific to Temecula: a Fire Department inspection, booked at 951-308-6363, must be scheduled and passed before the building inspection can be scheduled. The fire inspector needs a certificate of compliance for all materials and parts, and the Fire Prevention Division does not accept an authorization to mark pages in its place; missing paperwork means a failed inspection and possible reinspection fees.

    Batteries and the other two routes

    Temecula's fire rules shape where a battery can go. Energy storage is not allowed in a garage unless the home has a residential fire sprinkler system, and no heat or smoke detector may be installed in the garage to get around that, since none is currently listed for the purpose. Ask each bidder to show the storage location on its plan.

    Projects that do not use SolarAPP+ have two other routes. Systems drawn on the City's Standard Plans qualify for expedited review of about three business days; everything else goes through standard review of 10 to 12 business days, and plans that are not City Standard Plans do not get expedited review. All systems must meet the City's residential photovoltaic and digital submittal requirements, and expanding an existing system rules out both faster routes.

    What a Temecula quote needs to explain

    Local project questions for Temecula
    CheckAsk each bidder
    Plan-check routeSay whether the job uses SolarAPP+, the 3-day expedited route on City Standard Plans, or the 10-to-12-day standard review.
    Battery locationConfirm storage is not in the garage unless the home has residential fire sprinklers.
    Fire inspectionSay who books the required Fire Department inspection (951-308-6363) and brings the certificates of compliance.
    Which utilityConfirm from your bill whether SCE or SDG&E serves the address and model that utility's solar rules.

    Related Temecula project questions

    Use these guides to prepare the specific questions a written bid needs to answer.

    A comparison to ask for

    If a Temecula bid includes a battery in the garage, ask whether your home has a residential fire sprinkler system. The City's fire rules do not allow energy storage in a garage without one, so a bid that places it there on an unsprinklered house will need a new location before it can pass inspection.

    Verify the company behind the Temecula quote

    Match the business name and license number on each Temecula proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.

    Permit fees and the filing route are on the Temecula solar cost and permit page.

    Temecula solar quote questions

    How long does a solar permit take in Temecula?

    SolarAPP+ approvals are issued automatically in the City's CSS portal. Systems built on City Standard Plans can use expedited review of about 3 business days, and other systems go through standard review of 10 to 12 business days.

    Can I put a home battery in my garage in Temecula?

    Only if the home has a residential fire sprinkler system. The City's fire rules also say no heat or smoke detector may be installed in the garage for this purpose, because none is currently listed for it.

    Does adding panels to an existing system qualify for fast permits in Temecula?

    No. The City says expansions to existing PV systems do not qualify for SolarAPP+ or expedited review.

    What are the best solar companies in Temecula?

    This site does not rank them. Look for a CSLB license covering solar, a company that has pulled Temecula permits through the City's CSS portal and knows the Fire Department inspection step, and written confirmation that it serves your address. The City reported 794 residential solar permits to the California Energy Commission for 2024, 41% issued online, so plenty of local installers file here; compare at least three written bids for the same system.

    Before you sign anything in Temecula

    Two of the contract terms that most often change what a quote really costs.

    Ask for a competing quote

    Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.

    Step 1 of 2 — your bill

    No contact details on this step. Nothing is sent until you submit the second step.

    Submitting does not guarantee a quote, savings, program funding or eligibility.

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Before you send anything

    What this is
    California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
    What happens after the form
    Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
    How you are contacted
    Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
    Using the site without submitting
    The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.