    Solar Companies in Moreno Valley, CA: Installer Counts and License Checks

    Moreno Valley's main electric utility, Moreno Valley Utility, is not in the state's solar interconnection data, which covers PG&E, SCE and SDG&E customers only. On the SCE-served addresses listed as Moreno Valley, utility records show 720 home solar systems connected in 2025, led by Sunrun (301), Bright Ops (97) and Freedom Forever (31). It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.

    California Rate Relief is a private solar referral service.

    Key facts

    Utility split
    MVU about 58%, SCE about 42%
    By area on the CEC map; check your bill
    California Energy Commissionchecked Sep 23, 2026
    MVU solar rate
    Rate B time-of-use
    Required for new solar and batteries; no oversizing
    Moreno Valley Utilitychecked Sep 23, 2026
    2023 solar permits
    548
    61% with storage, 36% issued online
    California Energy Commission (SB 379 reports)checked Sep 23, 2026

    Installers who connected the most home solar systems on SCE-served Moreno Valley addresses in 2025

    Home solar systems per installer at SCE-served addresses listed as Moreno Valley, from utility interconnection records
    Installer (name as reported)Systems in 2025Jan 2024 to May 2026CSLB license
    Sunrun301704750184 check
    Bright Ops971941020761 check
    Freedom Forever31871029644 check
    Tesla Energy Operations Inc2549888104 check
    Better Earth Electric Inc23381024460 check
    My Smart House LLC18211095569 check
    Bryton Power LLC1724826729 check
    V3 Electric Inc13221000573 check

    Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026). These are SCE customers whose service address the utility lists under Moreno Valley; Moreno Valley Utility customers are not in the data. The CEC's utility map puts Moreno Valley Utility on about 58% of city land on the CEC map, with SCE on the rest.

    Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).

    Start with your bill

    Or tap a typical amount

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Home solar on SCE-served Moreno Valley addresses by the numbers

    SCE approved 720 home solar systems at SCE-served addresses listed as Moreno Valley in 2025, from 87 installers; the top three were named on 60% of them. The busiest year since 2021 was 2023, with 1,649 (2025: -56%). Another 292 were approved from January through May 2026.

    2025 mix: 74% leased or on a power purchase agreement, 26% owned by the household; 87% with a battery; median size 7.2 kW DC.

    Home solar systems connected per year at SCE-served addresses listed as Moreno Valley, 2021 to 2025
    Year20212022202320242025
    Systems connected1,0031,5801,649989720

    Hiring a solar company in Moreno Valley

    Solar companies in Moreno Valley have to design for one of two utilities. Moreno Valley Utility, the City's own, serves about three-fifths of the city's area and requires new solar or battery customers to take its Rate B time-of-use rate, caps systems at your past year's use and charges a $75 review fee; SCE serves the rest under its Solar Billing Plan. All permits go through SimpliCITY. Compare at least three written bids.

    Solar on Moreno Valley Utility

    The City Council approved MVU's Residential Rate B time-of-use rate for all residential solar customers effective December 15, 2020. It is optional for other homes but required for customers who install solar, a battery or both; a customer who produces more than it uses in a billing period still receives a monetary credit. Existing solar customers were grandfathered for 15 years on the NEM and NEM2 rates, but expanding a system by 10% or more, or adding a battery, moves the account to Rate B.

    MVU takes residential interconnections only through its Solar & Storage Application, with a customer-signed Solar Consumer Protection Guide and a $75 non-refundable review fee. It may require a utility-provided energy audit for homes more than five years old, and it does not allow oversized systems: a system cannot exceed one year of usage history, and without that history MVU applies its own sizing formula. Components must be new and approved by MVU, and MVU says panels and inverters should appear on the Energy Commission's certified lists.

    Permits and SCE addresses in Moreno Valley

    All building permits go through SimpliCITY. A solar permit covers the array, the inverter and batteries included with the solar; a separate electrical permit is required for a panel upgrade or subpanel, or when a battery is installed on its own or added to an existing system. The City reported SolarAPP+ as its automated platform, and the SolarAPP+ program lists it as accepting storage but not panel upgrades or breaker derates. Its 2023 report counted 548 residential solar permits, about 61% with storage and 36% issued online.

    About two-fifths of the city is SCE territory on the Energy Commission's map. There, SCE's Solar Billing Plan applies: exports earn hourly credits, locked for nine years, with about $0.04 per kWh more for eligible customers who enroll before 2028, and the True-Up comes in the month the system started.

    What a Moreno Valley quote needs to explain

    Local project questions for Moreno Valley
    CheckAsk each bidder
    Which utilityName MVU or SCE from your bill and model that utility's solar rules.
    MVU sizingFor MVU, size to no more than one year of usage history.
    MVU paperworkInclude MVU's Solar & Storage Application, the signed Solar Consumer Protection Guide and the $75 fee.
    Electrical permitAdd a separate electrical permit for a panel upgrade, subpanel or stand-alone battery.

    Related Moreno Valley project questions

    Use these guides to prepare the specific questions a written bid needs to answer.

    A comparison to ask for

    For an MVU address, ask each bidder to size the system to your last year of use, since MVU does not allow oversized systems, and to model Rate B time-of-use. For an SCE address, the Solar Billing Plan applies. A bidder quoting the same savings for both has not read your bill.

    Verify the company behind the Moreno Valley quote

    Match the business name and license number on each Moreno Valley proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison. What you pay the utility today is on the Moreno Valley rates and bills page.

    Moreno Valley solar quote questions

    What is the best solar company in Moreno Valley?

    This site does not rank them. Shortlist companies with a CSLB license covering solar that can tell you whether your address is MVU or SCE, have handled that utility's interconnection, and confirm your address in writing. Then compare at least three written bids built on your own bill.

    What are Moreno Valley Utility's solar rules?

    New solar, battery and solar-plus-battery customers must take MVU's Residential Rate B time-of-use rate, which still gives a monetary credit in a billing period when you produce more than you use. MVU does not allow oversized systems: size cannot exceed one year of usage history. A $75 non-refundable review fee applies, and homes over five years old may need a utility energy audit first.

    Does adding a battery change my MVU rate?

    Yes. MVU says adding battery storage to an existing solar system, or expanding the system by 10% or more, moves the account to Rate B time-of-use. Existing solar customers were grandfathered for 15 years on the NEM and NEM2 rates.

    How many solar permits does Moreno Valley issue?

    Moreno Valley reported 548 residential solar permits to the California Energy Commission for 2023. Of those, 335, about 61%, included battery storage, and 200, about 36%, were issued online.

    Before you sign anything in Moreno Valley

    Two of the contract terms that most often change what a quote really costs.

    Ask for a competing quote

    Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.

    Step 1 of 2 — your bill

    No contact details on this step. Nothing is sent until you submit the second step.

    Submitting does not guarantee a quote, savings, program funding or eligibility.

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Before you send anything

    What this is
    California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
    What happens after the form
    Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
    How you are contacted
    Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
    Using the site without submitting