Independent information and referral site. Not a utility, contractor or government agency. Figures link to their sources. How we make money
California solar decisions
Solar Companies in Rocklin, CA: Who Installed the Most Systems in 2025
Utility records show 684 home solar systems connected in Rocklin in 2025. Citadel Roofing and Solar was the installer of record on 130 of them, followed by Sunrun (112) and Sonray Construction (55). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Supplies the generation
- Pioneer Community Energy
- Rocklin is a Pioneer member city; PG&E delivers
- Pioneer Community Energychecked Sep 23, 2026
- Batteries on SolarAPP+
- Not eligible
- Solar with storage goes through standard review
- City of Rocklinchecked Sep 23, 2026
Installers who connected the most home solar systems in Rocklin in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Citadel Roofing and Solar | 130 | 238 | 647149 check |
| Sunrun | 112 | 199 | 750184 check |
| Sonray Construction | 55 | 88 | 922628 check |
| Tesla Energy Operations Inc | 44 | 84 | 888104 check |
| North Valley LLC | 32 | 45 | 1080746 check |
| Better Earth Electric Inc | 23 | 31 | 1024460 check |
| Complete Solar Inc | 20 | 21 | 961988 check |
| Senga Energy LLC | 18 | 32 | 1033247 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in Rocklin by the numbers
PG&E approved 684 home solar systems in Rocklin in 2025, from 82 installers; the top three were named on 43% of them. The busiest year since 2021 was 2022, with 1,242 (2025: -45%). Another 193 were approved from January through May 2026.
2025 mix: 31% leased or on a power purchase agreement, 69% owned by the household; 36% with a battery; median size 6.2 kW DC. Placer County: 32% leased or PPA, 34% with a battery, median 6.05 kW.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 953 | 1,242 | 1,166 | 424 | 684 |
Hiring a solar company in Rocklin
In Rocklin, a solar company files a rooftop panel job through SolarAPP+ for an extra $25, then pulls the City permit and books inspections in eTRAKiT; any job that includes a battery, and any owner-builder job, takes the City's standard review instead. PG&E delivers your power and Pioneer Community Energy supplies it, with a small bonus on year-end surplus. Get three written bids and compare them on the checks below.
Start with your Rocklin electricity bill
Rocklin’s electricity information identifies PG&E delivery and a choice of Pioneer Community Energy generation. Pioneer has separate guidance for legacy NEM and Solar Billing Plan customers. Read the enrollment and generation provider on your bill before comparing export credits.
Rocklin's online permit, and what it leaves out
Rocklin's online solar page walks a contractor through six steps: create a SolarAPP+ account, submit the plans, pay SolarAPP+'s $25 fee, upload the approved plans to the City's eTRAKiT system, pay the City's own permit fees, and, once eTRAKiT issues the permit, install and schedule inspections through eTRAKiT or by calling the Building Division at (916) 625-5120. City permit fees and inspections apply in addition to the SolarAPP+ charge.
The page is explicit about two exclusions: owner-builder projects and projects that include an energy storage system are not eligible for SolarAPP+ at this time. So a Rocklin quote for panels alone and a quote for panels plus a battery follow different permit paths, and the second one takes longer. Ask each bidder which path it has assumed and whether its timeline allows for standard review if a battery is in the scope.
What Pioneer adds for a Rocklin solar home
Pioneer Community Energy has served Rocklin since its 2018 launch alongside Auburn, Colfax, Lincoln, Loomis and most of unincorporated Placer County. A system installed since April 15, 2023 is on the Solar Billing Plan, where Pioneer values exports at a variable export rate and positive charges are paid monthly; older systems on net energy metering earn retail credits that roll forward month to month.
Pioneer reviews each solar account over the past twelve months during the March or April billing cycle and pays Net Surplus Compensation at half a cent per kWh more than PG&E's rate. A surplus worth more than $50 is paid by check; a smaller one becomes a bill credit. Because that bonus is small, the decision rests on how much of your own usage the system covers, so ask each bidder to show monthly production against your monthly use.
What a Rocklin quote needs to explain
| Check | Ask each bidder |
|---|---|
| Pioneer and PG&E | Show generation and delivery charges/credits under your actual enrollment. |
| Ownership or program | State who owns the equipment, how charges appear and what transfer or buyout requires. |
| Electric PV scope | Separate electric generation from solar pool/water heating and specify any battery or generator option. |
A comparison to ask for
If you compare a purchase proposal with Pioneer’s GridGen program, separate system ownership from the utility bill. GridGen describes solar-plus-storage and battery-retrofit options with charges on the utility bill and its own transfer/buyout terms. Compare total obligations, who services the system and what happens when the home is sold.
Verify the company behind the Rocklin quote
Match the business name and license number on each Rocklin proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.
Permit fees and the filing route are on the Rocklin solar cost and permit page.
Rocklin solar quote questions
Can a Rocklin solar permit with a battery go through SolarAPP+?
No, not at present. The City's online solar permitting page says projects that include energy storage systems, and owner-builder projects, are not eligible for SolarAPP+ and go through the City's standard review.
What does Pioneer pay for extra solar power in Rocklin?
Pioneer pays Net Surplus Compensation at an extra half cent per kWh above PG&E's rate after its March or April annual review, by check if the amount is over $50 and as a bill credit otherwise.
Is Rocklin solar billed under SMUD’s rules?
Rocklin’s city page identifies PG&E delivery and Pioneer generation as an option. Check your own meter’s account; a Sacramento-area label does not make SMUD assumptions applicable.
Is a program charge on my utility bill the same as buying the system?
No. Pioneer’s GridGen page describes separate ownership and transfer/buyout terms. Compare those written obligations with an outright purchase and other available contracts.
Before you sign anything in Rocklin
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.