Independent information and referral site. Not a utility, contractor or government agency. Figures link to their sources. How we make money
California solar decisions
Solar Companies in Richmond, CA: Who Installed the Most Systems in 2025
Utility records show 453 home solar systems connected in Richmond in 2025. Bright Ops was the installer of record on 85 of them, followed by Sunrun (69) and Grid Alternatives (52). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Instant permit needs
- CSLB license + City business tax certificate
- Both current, plus correctly named uploads
- City of Richmondchecked Sep 23, 2026
Installers who connected the most home solar systems in Richmond in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Bright Ops | 85 | 178 | 1020761 check |
| Sunrun | 69 | 205 | 750184 check |
| Grid Alternatives | 52 | 115 | 867533 check |
| Freedom Forever | 19 | 32 | 1029644 check |
| Tesla Energy Operations Inc | 17 | 28 | 888104 check |
| Complete Solar Inc | 16 | 16 | 961988 check |
| Citadel Roofing and Solar | 14 | 28 | 647149 check |
| Semper Solaris | 9 | 14 | 978152 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in Richmond by the numbers
PG&E approved 453 home solar systems in Richmond in 2025, from 89 installers; the top three were named on 45% of them. The busiest year since 2021 was 2023, with 642 (2025: -29%). Another 192 were approved from January through May 2026.
2025 mix: 56% leased or on a power purchase agreement, 44% owned by the household; 52% with a battery; median size 4.87 kW DC. Contra Costa County: 43% leased or PPA, 58% with a battery, median 6.48 kW.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 355 | 535 | 642 | 455 | 453 |
Hiring a solar company in Richmond
Solar companies installing in Richmond, California can get an instant permit through SolarAPP+, but only with a current CSLB license and a current City of Richmond Business Tax Certificate on file, which makes the permit a quick check on who you are hiring. Historic-register homes need a certificate of appropriateness first. MCE supplies Richmond's generation and PG&E delivers it. Compare three written bids on the checks below.
Richmond's SolarAPP+ conditions
The City of Richmond uses SolarAPP+ for residential, roof-mounted retrofit systems that pass its eligibility checklist. SolarAPP+ charges its own processing fee; the contractor downloads the approved documents, applies for the building permit in the City's permitting system with the SolarAPP+ approval ID, uploads the SolarAPP+ documents and schedules the inspection. The City creates the permit instantly only when the contractor's CSLB license and its City of Richmond Business Tax Certificate are both current and the two uploads are named exactly as the City requires.
Those conditions double as a screen. A company that cannot get an instant permit in Richmond is missing a current license or a City business registration, and both are worth knowing about before you sign.
Historic properties and MCE's rules
Richmond adds one local step. If a property is listed on the Richmond Historic Register, the applicant must obtain a certificate of appropriateness from the Planning Division before using SolarAPP+, and the Division issues it only when the installation is consistent with the Secretary of the Interior's standards for rehabilitation. Ask the bidder to check the register for your address before promising a timeline.
On the bill side, MCE serves Richmond. Systems whose applications were filed before April 14, 2023 stay on net energy metering; later ones are on the Solar Billing Plan. MCE's annual cycle runs April through March and pays surplus at the Net Surplus Compensation rate plus $0.02 per kWh, up to $5,000 a year, with another $0.01 per kWh for customers on its Deep Green option; amounts of $200 or less arrive as a bill credit.
What a Richmond quote needs to explain
| Check | Ask each bidder |
|---|---|
| City credentials | Confirm the contractor has a current CSLB license and a current Richmond Business Tax Certificate. |
| Historic status | Check whether the property is on the Richmond Historic Register and, if so, who obtains the certificate of appropriateness. |
| MCE and PG&E account | Model MCE generation and PG&E delivery from your actual bill. |
| Permit filing | Say who files in SolarAPP+ and the City's permit system, and who schedules the inspection. |
A comparison to ask for
For an older Richmond house, ask each bidder to check the Richmond Historic Register before quoting a timeline. A listed property needs the Planning Division's certificate of appropriateness before SolarAPP+ can be used, and the Division issues it only when the installation is consistent with the Secretary of the Interior's rehabilitation standards, which may change where the panels can go.
Verify the company behind the Richmond quote
Match the business name and license number on each Richmond proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison. What you pay the utility today is on the Richmond rates and bills page.
Permit fees and the filing route are on the Richmond solar cost and permit page.
Richmond solar quote questions
What does a contractor need to pull a solar permit in Richmond, California?
For the City's instant SolarAPP+ permit, the contractor's CSLB license and its City of Richmond Business Tax Certificate must both be current, and the SolarAPP+ approval documents and signed permit application must be uploaded under the names the City specifies.
Do historic homes in Richmond need extra approval for solar?
Yes, if the property is listed on the Richmond Historic Register. The applicant must obtain a certificate of appropriateness from the Planning Division before applying through SolarAPP+.
Is Richmond, California served by MCE?
Yes. MCE lists Richmond among its Contra Costa County member communities; PG&E still delivers the power and sends the bill.
Before you sign anything in Richmond
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.