Independent information and referral site. Not a utility, contractor or government agency. Figures link to their sources. How we make money
California solar decisions
Solar Companies in San Bernardino, CA: Who Installed the Most Systems in 2025
Utility records show 983 home solar systems connected in San Bernardino in 2025. Sunrun was the installer of record on 245 of them, followed by Sunnova Energy Corporation (99) and Bright Ops (93). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Permit platform
- Symbium
- Solar and storage under 38.4 kW, per SB 379
- City of San Bernardinochecked Sep 23, 2026
- Processing time
- About 1 to 3 business days
- Depends on staff availability
- City of San Bernardinochecked Sep 23, 2026
- Electric utility
- SCE
- No community choice provider mapped over the city
- California Energy Commissionchecked Sep 23, 2026
Installers who connected the most home solar systems in San Bernardino in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Sunrun | 245 | 523 | 750184 check |
| Sunnova Energy Corporation | 99 | 141 | 1003498 check |
| Bright Ops | 93 | 202 | 1020761 check |
| V3 Electric Inc | 90 | 210 | 1000573 check |
| Bryton Power LLC | 41 | 58 | 826729 check |
| Freedom Forever | 27 | 110 | 1029644 check |
| Tesla Energy Operations Inc | 24 | 55 | 888104 check |
| Better Earth Electric Inc | 18 | 55 | 1024460 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in San Bernardino by the numbers
SCE approved 983 home solar systems in San Bernardino in 2025, from 114 installers; the top three were named on 44% of them. The busiest year since 2021 was 2022, with 1,642 (2025: -40%). Another 282 were approved from January through May 2026.
2025 mix: 76% leased or on a power purchase agreement, 24% owned by the household; 84% with a battery; median size 6.47 kW DC. San Bernardino County: 58% leased or PPA, 75% with a battery, median 6.3 kW.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 839 | 1,642 | 1,616 | 1,238 | 983 |
Hiring a solar company in San Bernardino
Solar companies in San Bernardino apply for residential solar and battery permits through the City's Symbium portal, which the City says may take about one to three business days, and need an active City business license before the permit is issued. A main panel upgrade needs a separate electrical permit. SCE supplies and delivers San Bernardino's power. Compare at least three written bids that model your own SCE bill.
Start with your San Bernardino electricity bill
San Bernardino has no community choice program on the Energy Commission's utility map; Southern California Edison supplies the generation, delivers it and bills for both. A new system goes on SCE's Solar Billing Plan, with exports credited monthly and a yearly settlement. SCE's fixed Base Services Charge stays on the bill whatever the system produces.
What San Bernardino asks for with a solar permit
The Symbium application needs a permit application and the contractor or owner-builder declarations; an owner-builder completes the City's Permit Application Declaration. If a representative of the contracting company signs for the permit instead of the license holder, the City requires a notarized letter of authorization. An active City of San Bernardino business license must be in place before the permit is issued.
The inspection has its own paperwork. The documents submitted through Symbium, bearing their submittal date and time stamp, must be on site in legible hard copy: an 11 by 14 inch site map, the single-line diagram, 8 by 11 inch equipment specification sheets, the inspection checklist and the job card. Ask your installer who prints and brings them.
When a San Bernardino job goes to the counter
The City strongly encourages Symbium but keeps a counter route at Vanir Tower, 290 North D Street, for projects that are not eligible or applicants who prefer it. Those applications get standard plan review unless a system of 10 kW or less meets the City's Eligibility Checklist for Expedited Residential Solar Permitting. A counter submittal needs one hard-copy set of 11 by 17 inch plans with specification sheets, structural calculations, the application, the declaration, the expedited checklist and a valid business license.
Once the system is running, SCE's Solar Billing Plan credits exports with Energy Export Credits that vary by hour, and a yearly settlement bill arrives in the month the system started service. SCE puts its Net Surplus Compensation Rate for any leftover surplus at about $0.02 per kWh, and says that storing your own energy for expensive hours is now worth more than exporting it. Ask each bidder how much of your output its model assumes you export.
Mobile and manufactured homes in San Bernardino County
Solar on a mobile or manufactured home follows state rules rather than the City's Symbium route. The California Department of Housing and Community Development says an HCD permit is required for any solar system installed on a manufactured home, and that a permit is needed before any alteration to one begins; San Bernardino County's own online permitting page says roof-mounted solar on a manufactured home must be permitted through HCD, and lists HCD's number, 951-782-4420. HCD's Southern Area Office is at 3737 Main Street in Riverside.
HCD's advisory warns that manufactured home roofs are not accessible, so damage from poor installation practices is not visible, and tells owners to make sure the solar company is licensed by the Contractors State License Board and has obtained a permit from HCD before signing. HCD's permit guidelines say when a job also needs form HCD MH 415, engineered plans, electrical load calculations or manufacturer specifications, so ask each bidder which of those your roof needs and who files them.
What a San Bernardino quote needs to explain
| Check | Ask each bidder |
|---|---|
| Permit route | Say whether the project uses Symbium or an in-person counter submittal, and why. |
| City business license | Confirm the contractor holds an active City of San Bernardino business license. |
| Panel upgrade permit | If the main panel is being replaced, confirm the separate electrical permit is in the scope and price. |
| Agent authorization | If someone other than the license holder signs for the permit, ask for the notarized letter of authorization the City requires. |
Related San Bernardino project questions
Use these guides to prepare the specific questions a written bid needs to answer.
A comparison to ask for
Ask each San Bernardino bidder whether the job will go through Symbium or the Building and Safety counter at Vanir Tower, and whether the price includes the separate electrical permit if your main panel needs upgrading. A bid that skips either answer may be assuming a timeline or a permit the City will not give.
Verify the company behind the San Bernardino quote
Match the business name and license number on each San Bernardino proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.
San Bernardino solar quote questions
How long does a solar permit take in San Bernardino?
The City says permits processed through its Symbium portal may take about one to three business days, depending on staff availability; missing documents can delay them.
Can I get a solar permit in San Bernardino without Symbium?
Yes. Applicants who are not eligible for Symbium, or who prefer not to use it, can apply in person at the Building and Safety counter. Those applications get standard plan review unless a system of 10 kW or less meets the City's expedited eligibility checklist.
Does a panel upgrade need its own permit in San Bernardino?
Yes. The City says electric panel upgrades require a separate electrical permit, which is obtained through the Solar Division of Community Development and Housing.
Can I put solar on a mobile home in San Bernardino County?
Yes, with a state permit. San Bernardino County says roof-mounted solar on a manufactured home must be permitted through the California Department of Housing and Community Development, and HCD requires its permit for any solar system on a manufactured home. Check the company's CSLB license and ask to see the HCD permit before work starts.
How many solar permits does San Bernardino issue?
The City reported 1,911 residential solar permits to the California Energy Commission for 2024, down from 2,879 in 2023. In 2024, 1,342 included battery storage and 1,004, about 53%, were issued online.
Before you sign anything in San Bernardino
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.