Utility records show 8,375 home solar systems connected in Orange County in 2025. Sunrun was the installer of record on 1,934 of them, followed by Tesla Energy Operations Inc (584) and Orange County Contracting Services (442). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Delivery utilities
- SCE, SDG&E, Anaheim
- SCE serves most of the county's area
- California Energy Commissionchecked Sep 23, 2026
- OCPA member cities
- Buena Park, Fullerton, Irvine
- Fountain Valley beginning service soon
- Orange County Power Authoritychecked Sep 23, 2026
- Automated permits required
- Since Sept. 30, 2023
- Cities over 50,000; most smaller cities since 2024
- California Legislature, Gov. Code § 65850.52checked Sep 23, 2026
Installers who connected the most home solar systems in Orange County in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Sunrun | 1,934 | 4,442 | 750184 check |
| Tesla Energy Operations Inc | 584 | 1,557 | 888104 check |
| Orange County Contracting Services | 442 | 752 | 1023627 check |
| Solara Home Energy LLC | 290 | 443 | 1103958 check |
| Sunnova Energy Corporation | 281 | 720 | 1003498 check |
| Bright Ops | 250 | 481 | 1020761 check |
| Freedom Forever | 225 | 715 | 1029644 check |
| Sunpower Corporation Systems | 213 | 1,187 | 890895 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026). The counts cover SCE and SDG&E customers across Orange County; customers of city-owned utilities are not in the data.
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in Orange County by the numbers
SCE and SDG&E approved 8,375 home solar systems in Orange County in 2025, from 504 installers; the top three were named on 35% of them. The busiest year since 2021 was 2023, with 19,853 (2025: -58%). Another 3,915 were approved from January through May 2026.
2025 mix: 40% leased or on a power purchase agreement, 60% owned by the household; 65% with a battery; median size 6.75 kW DC.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 9,602 | 15,252 | 19,853 | 9,087 | 8,375 |
Who serves each Orange County city, and who issues the permit
The California Energy Commission's utility map shows three delivery utilities in the county. SCE covers most of it, SDG&E serves the southern end (SDG&E describes its territory as San Diego and southern Orange counties), and the City of Anaheim runs its own public utility. A few cities in the south straddle the SCE and SDG&E line, so the table marks them as split.
Generation is a second layer. Orange County Power Authority, the county's community choice aggregator, lists its current member cities as Buena Park, Fullerton and Irvine, with Fountain Valley beginning service soon. Huntington Beach was a member but left: OCPA says its customers there were returned to SCE in 2024.
| Place | Delivers power | Generation | Solar permit |
|---|---|---|---|
| Anaheim | Anaheim Public Utilities | Anaheim Public Utilities | City of Anaheim |
| Buena Park | SCE | Orange County Power Authority | City of Buena Park |
| Fullerton | SCE | Orange County Power Authority | City of Fullerton |
| Irvine | SCE | Orange County Power Authority | City of Irvine |
| Fountain Valley | SCE | SCE; OCPA service beginning soon | City of Fountain Valley |
| Huntington Beach | SCE | SCE (returned from OCPA in 2024) | City of Huntington Beach |
| Santa Ana | SCE | SCE | City of Santa Ana |
| Westminster | SCE | SCE | City of Westminster |
| Yorba Linda | SCE | SCE | City of Yorba Linda |
| La Habra | SCE | SCE | City of La Habra (SolarAPP+) |
| Newport Beach | SCE | SCE | City of Newport Beach (SolarAPP+) |
| Tustin | SCE | SCE | City of Tustin (SolarAPP+); unincorporated North Tustin: County of Orange |
| Lake Forest | SCE | SCE | City of Lake Forest (SolarAPP+) |
| Costa Mesa, Garden Grove, Orange | SCE | SCE | Each city's own building department |
| Mission Viejo | Split: SCE or SDG&E by address | The delivery utility | City of Mission Viejo (SolarAPP+) |
| Aliso Viejo | Split: SCE or SDG&E by address | The delivery utility | City of Aliso Viejo (SolarAPP+) |
| Laguna Hills, Laguna Niguel | Split: SCE or SDG&E by address | The delivery utility | Each city's own building department |
| San Clemente | SDG&E | SDG&E | City of San Clemente |
| San Juan Capistrano, Dana Point | SDG&E | SDG&E | Each city's own building department |
| Unincorporated areas (Ladera Ranch, Rossmoor and others) | SDG&E in Ladera Ranch; SCE in Rossmoor | The delivery utility | County of Orange (OC Development Services) |
Utility and generation rows come from the Energy Commission's map, queried September 23, 2026, and OCPA's own member list, which is newer than the map's community choice layer. The map can still shade Huntington Beach as OCPA; OCPA's page is the current word. For any split city, the bill is the only reliable answer for one address. Where a permit platform is named, it is the one the city reported to the Energy Commission under SB 379 (program data updated August 3, 2026, checked September 24, 2026).
For what each of these utilities charges today, see Orange County electric rates and bills by provider.
Hiring a solar company in Orange County
Orange County solar companies work across three delivery utilities: SCE for most of the county, SDG&E in the south and Anaheim Public Utilities in Anaheim. In Buena Park, Fullerton and Irvine, Orange County Power Authority supplies the generation; Huntington Beach left OCPA in 2024. Each city issues its own permit, and the County of Orange permits unincorporated areas. Compare at least three written bids built on your own bill.
Start with your Orange County electricity bill
In Orange County the bill decides more than the zip code does. SCE delivers power to most of the county, SDG&E to the south end, and the City of Anaheim to Anaheim. In Buena Park, Fullerton and Irvine, Orange County Power Authority supplies the generation on an SCE bill. Each of those four sets its own solar credit rules, so a quote has to start from the provider names printed on your own statement.
Three solar credit rulebooks in one county
On an SCE bill, a new system goes on SCE's Solar Billing Plan: exports earn Energy Export Credits that vary by hour and season, SCE locks the values for nine years from the year you start, and customers who enroll before 2028 get a bonus credit of about $0.04 per kWh, or about $0.09 if income-qualified. The settlement bill comes once a year, in the month the system started service.
In Buena Park, Fullerton and Irvine the generation half of that bill belongs to Orange County Power Authority. OCPA says SCE handles the delivery charges and credits while OCPA handles generation, reconciles generation charges monthly and holds its annual true-up in April, before summer, so that credits built up in sunny months can be used at the retail rate. It pays 10% more than SCE for surplus left at true-up.
In the SDG&E cities of the south county, the Solar Billing Plan runs on SDG&E's EV-TOU-5 time-of-use plan, with on-peak hours from 4 p.m. to 9 p.m. Export credits are priced by the hour, surplus credits roll forward month to month, and SDG&E says they cannot be applied to non-bypassable charges or the Base Services Charge. Anaheim Public Utilities, as a city utility, sets its own solar terms outside the CPUC's tariff.
How permits differ across the county
Government Code section 65850.52, the law passed as SB 379, told every California city and county to offer an online, automated permitting platform such as SolarAPP+ for residential solar up to 38.4 kW, and for batteries paired with it. Cities of more than 50,000 people had to comply by September 30, 2023, and smaller cities by September 30, 2024, unless a city has fewer than 5,000 people or sits in a county of fewer than 150,000. Orange County is far larger than that, so the county exemption does not apply to its cities. The law also lets a jurisdiction send a design the platform cannot process through its regular review.
The County of Orange launched SolarAPP+ for unincorporated homes on August 23, 2024, for roof-mounted systems on existing homes, submitted by registered licensed contractors. It also keeps the expedited path that AB 2188 required every city and county to adopt by September 30, 2015: an eligibility checklist, standard plans for central-inverter and microinverter systems, structural criteria and an online application. The city pages linked in the table above describe each city's own steps where this site has checked them, such as Huntington Beach's SolarAPP+ record in its HB ACA portal.
What an Orange County quote needs to explain
| Check | Ask each bidder |
|---|---|
| Utility and CCA | Name the delivery utility (SCE, SDG&E or Anaheim) and the generation provider (OCPA or the utility) from your bill. |
| Credit rules | Model that provider's export credits and true-up month, not a county average. |
| Permit office | Say whether your city or the County of Orange issues the permit, and whether the job uses SolarAPP+ or a standard plan check. |
| Split cities | In Mission Viejo, Aliso Viejo, Laguna Hills or Laguna Niguel, confirm which utility serves the address before comparing savings. |
Related Orange County project questions
Use these guides to prepare the specific questions a written bid needs to answer.
A comparison to ask for
Ask every Orange County bidder to put two things at the top of the proposal: the utility and generation provider from your bill, and the permit office for your address. A bid that assumes SCE and OCPA for a Mission Viejo or Laguna Niguel home that SDG&E actually serves, or that prices an Anaheim home at SCE's rates, is working from the wrong numbers before it gets to the roof.
Verify the company behind the Orange County quote
Match the business name and license number on each Orange County proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.
Orange County solar quote questions
What are the best solar companies in Orange County?
This site does not rank them, and no public source does in a way that fits your roof. Narrow the field to companies that hold a CSLB license covering solar, confirm in writing that they serve your address, and get at least three written bids for the same system built on your own bill. The table above tells you which utility rules each bid should use.
Is Huntington Beach still part of Orange County Power Authority?
No. OCPA says the Huntington Beach City Council voted to leave in May 2023, solar customers there were switched back to SCE in April 2024 and all other customers in June 2024. SCE now supplies both generation and delivery in Huntington Beach.
What does OCPA pay solar customers?
OCPA says it reconciles generation charges monthly, runs its annual true-up in April, pays 10% more than SCE for excess generation, and currently treats Net Billing Tariff customers' generation as if it were under NEM 2.0. SCE still handles delivery charges and credits on the same bill.
Who issues solar permits in unincorporated Orange County?
The County of Orange, through OC Development Services. It accepts SolarAPP+ submittals from registered licensed contractors, launched in August 2024, and also offers an expedited plan check on its standard plans, with applications filed online in myOCeServices.
Does every Orange County city have instant solar permits?
Not necessarily instant, but state law requires an online, automated permit option such as SolarAPP+ in cities of more than 50,000 people since September 30, 2023 and in most smaller cities since September 30, 2024, for systems up to 38.4 kW that the platform can process. Designs it cannot process still go through regular plan check.
Before you sign anything in Orange County
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.