Skip to main content

    Independent information and referral site. Not a utility, contractor or government agency. How we make money

    California solar decisions

    Solar Companies in Rancho Cucamonga, CA: Who Installed the Most Systems in 2025

    Utility records show 376 home solar systems connected in Rancho Cucamonga in 2025. Sunrun was the installer of record on 104 of them, followed by Tesla Energy Operations Inc (51) and Bright Ops (29). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.

    California Rate Relief is a private solar referral service.

    Key facts

    Home solar systems connected, 2025
    376
    Rancho Cucamonga, SCE customers
    CPUC DG Statschecked Sep 24, 2026
    Leased or PPA
    53%
    Share of 2025 systems a company owns
    CPUC DG Statschecked Sep 24, 2026

    Installers who connected the most home solar systems in Rancho Cucamonga in 2025

    Home solar systems per installer in Rancho Cucamonga, from utility interconnection records
    Installer (name as reported)Systems in 2025Jan 2024 to May 2026CSLB license
    Sunrun104222750184 check
    Tesla Energy Operations Inc51119888104 check
    Bright Ops29451020761 check
    V3 Electric Inc20351000573 check
    Daylight Solar Energy Corp1112903293 check
    Freedom Forever Southern California LLC991124448 check
    SWSS Electrical7101004667 check
    Luxor Energy Inc7131102673 check

    Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).

    Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).

    Start with your bill

    Or tap a typical amount

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Home solar in Rancho Cucamonga by the numbers

    SCE approved 376 home solar systems in Rancho Cucamonga in 2025, from 78 installers; the top three were named on 49% of them. The busiest year since 2021 was 2023, with 852 (2025: -56%). Another 173 were approved from January through May 2026.

    2025 mix: 53% leased or on a power purchase agreement, 47% owned by the household; 92% with a battery; median size 8.51 kW DC. San Bernardino County: 58% leased or PPA, 75% with a battery, median 6.3 kW.

    Home solar systems connected per year in Rancho Cucamonga, 2021 to 2025
    Year20212022202320242025
    Systems connected462758852365376

    Start with your Rancho Cucamonga electricity bill

    The City says Southern California Edison is the main electric provider in Rancho Cucamonga, and that its own Rancho Cucamonga Municipal Utility (RCMU) serves over 3,900 metered businesses and residents in a selected area in the southeastern part of the city. Use the provider, rate plan and usage history on the actual electricity account. A proposal should disclose its system-production and remaining-bill assumptions for the property rather than substitute a citywide rate or an advertised savings figure.

    What a Rancho Cucamonga quote needs to explain

    Local project questions for Rancho Cucamonga
    CheckAsk each bidder
    Account-specific modelUse the rate plan and usage history printed on the actual account; ask for the inputs behind the production and remaining-bill model.
    Permit routeAsk whether the online permit center or SolarAPP+ applies and name who submits the plans, pays the permit fees and schedules inspection.
    Project scopeList roof work, panel/service changes, storage, backup circuits and warranty responsibility separately from the core solar array.

    A comparison to ask for

    Put the same year of usage, roof layout and equipment scope into every proposal. Then separate the solar array, storage, roof work, electrical work, permit/inspection duties, contract total and remaining utility charges. Compare the signed scope, not the headline payment.

    Verify the company behind the Rancho Cucamonga quote

    Match the business name and license number on each Rancho Cucamonga proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.

    Permit fees and the filing route are on the Rancho Cucamonga solar cost and permit page.

    Rancho Cucamonga solar quote questions

    Does every Rancho Cucamonga solar project qualify for SolarAPP+?

    No. The City describes SolarAPP+ for eligible residential project types and directs other work to the online permit center. Confirm the route for the actual design and property.

    What should I compare beyond the quoted payment?

    Compare the written total, roof and electrical scope, permit duties, equipment, warranty responsibility, production inputs and remaining utility charges.

    Before you sign anything in Rancho Cucamonga

    Two of the contract terms that most often change what a quote really costs.

    Ask for a competing quote

    Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.

    Step 1 of 2 — your bill

    No contact details on this step. Nothing is sent until you submit the second step.

    Submitting does not guarantee a quote, savings, program funding or eligibility.

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Before you send anything

    What this is
    California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
    What happens after the form
    Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
    How you are contacted
    Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
    Using the site without submitting
    The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.