    Shasta County · Reported cost

    Solar Panel Cost in Redding, CA (2026): $4.00/W County Median

    By Updated 9 sources citedRedding, Shasta County

    MethodologyHow we make moneyEditorial policy

    Homeowners in Shasta County who bought their own solar systems reported a median of $4.00 per watt between January 2025 and May 2026, across 299 systems. The middle half paid $3.19 to $5.64 per watt.

    Redding Electric Utility (REU), Redding's main utility, is not in the CPUC's interconnection data, which covers only PG&E, SCE and SDG&E. The figure above is the nearest one: Shasta County homes those three utilities serve.

    A 7.94 kW system, the median size connected in Shasta County in 2025, comes to about $31,800 at that median, or $25,300 to $44,800 across the middle half.

    Those are reported costs, not a quote, and no federal credit comes off a Redding system finished in 2026: 26 U.S.C. §25D does not cover one whose installation is completed after December 31, 2025 (state and federal rules).

    Median reported cost
    $4.00/W
    Shasta County, IOU-served homes, 299 systems
    Middle half
    $3.19 to $5.64/W
    25th to 75th percentile
    Typical 7.94 kW system
    $31,800
    7.94 kW × $4.00/W, before any incentive
    Same system, middle half
    $25,300 to $44,800
    size: Shasta County, IOU-served homes, 2025 median

    Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026, checked September 24, 2026. Homeowner-owned, solar-only systems of 1 to 25 kW; leases, PPAs and battery systems are left out (method). The CPUC notes these costs are not verified by the government.

    California Rate Relief is a referral service. We are not a licensed contractor.

    Start with your bill

    Or tap a typical amount

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    What a solar permit costs in Redding

    Redding's published permit fee for a home rooftop system is $450 (residential PV, 7 to 15 kW). Above 15 kW: $450.00 plus $15.00 per kW; battery (alternative power source) $187.50.

    That is exactly the $450 limit that Government Code §66015 sets for a home system up to 15 kW.

    • What Redding publishes: Redding's Master Fee Schedule for fiscal year 2025-26 lists a residential photovoltaic system of 7 to 15 kW at $450.00, and a system of 16 kW and up at $450.00 plus $15.00 for each kW above 15 kW; the schedule has no line for a smaller system. The fiscal year 2026-27 schedule, whose building permit fees take effect October 19, 2026, keeps both figures. A battery is permitted separately, under the schedule's alternative power source line: $187.50, rising to $193.00 when the new building fees take effect. Redding Electric Utility's own solar paperwork and Generator Number come before the City permit.
    • How to file: Yes. The Building Division's Apply for a Permit link opens the City's EnerGov Self Service portal, but the City will not accept a solar building permit application until Redding Electric Utility has received every item on its Solar PV Checklist and issued a Generator Number. The California Energy Commission's SB 379 data lists Redding's platform as SolarAPP+.
    • Automated permit platform: SolarAPP+. Per the CEC SB 379 data (self-reported); REU paperwork and a Generator Number come before the City permit.

    Sources: Redding Electric Utility, Solar Photovoltaic (PV) Program, checked September 24, 2026; City of Redding, Adopted FY 2025-26 Master Fee Schedule (Building Division, Electric Permit Fees: Photo Voltaic Systems - Residential; Alternative Power Source Other Than Solar Permit), checked September 24, 2026; City of Redding, Adopted FY 2026-27 Master Fee Schedule (development and building permit fees effective October 19, 2026, per the City's Master Fee Schedule page), checked September 24, 2026; California Energy Commission, Residential Solar Permitting Program data (SB 379 platform status as self-reported by each jurisdiction; data last updated August 3, 2026), checked September 23, 2026; Gov. Code §66015, checked September 24, 2026. Redding in the California Solar Cost Index sets this fee beside every other city's.

    Solar data for Redding: REU is not covered

    REU customers are not in the CPUC data, so nothing in it describes most Redding homes. It does list 126 systems connected in 2025 at addresses it records as Redding in PG&E territory; those homes buy power from PG&E, not REU.

    Across Shasta County homes served by PG&E, SCE or SDG&E, 38% of 2025 systems were leased or on a PPA, 39% had a battery and the median size was 7.94 kW.

    Source: CPUC DG Stats, data through May 31, 2026. Counts are home systems given permission to operate each year; a city means the service city on the application.

    Your utility: REU

    Redding is billed by Redding Electric Utility (REU). The CPUC's average-rate reports do not cover REU; read its own tariff and your bill.

    Before you compare proposals

    The Redding project checks that change the decision

    Redding is served by Redding Electric Utility, not PG&E. REU caps system size by past usage, credits exports at its own value, and must sign off before the City will accept a building permit application.

    Ask the same three questions

    1. Is the system within REU's limit of 1 kW DC per 1,752 kWh of the past 12 months' use?
    2. Does the permit line match the City's $450.00 for a 7 to 15 kW system, plus the separate battery permit if storage is included?
    3. Is the savings estimate built on REU's monthly net billing and its E1 rate, not on PG&E's Solar Billing Plan?

    Local checks

    A size cap tied to usage

    REU limits a home system to 1 kW DC for every 1,752 kWh used on site in the previous 12 months; 12,000 kWh a year allows about 6.85 kW DC. A system sized beyond on-site demand does not qualify as a net generator.

    Utility first, then the City

    The City of Redding Building Division will not accept a building permit application until REU has every item on its Solar PV Checklist and has issued a Generator Number.

    Monthly net billing

    Under REU's Zero Net Energy Service, energy used is billed monthly at the retail rate and surplus is credited at the current value of solar. REU's E1 residential rate is a $40.00 monthly fixed charge plus $0.1492 per kWh.

    REU turns it on

    The generator disconnect must sit within 10 feet of and in sight of the REU meter, and REU personnel switch it on only after the City final inspection and REU commissioning.

    Local sources and limits
    • Redding Electric Utility — Solar Photovoltaic (PV) Program — verified 2026-09-23. Zero Net Energy Service: monthly billing, retail rate for energy used and a current-value-of-solar credit for surplus; system limited to 1 kW DC per 1,752 kWh of prior 12-month use; REU checklist and Generator Number required before the City Building Division accepts a permit application; generator disconnect within 10 feet and in sight of the meter, turned on by REU after final inspection; contractors need a C-10, C-46, A or B license.
    • City of Redding — Rates & Fees (Redding Electric Utility) — verified 2026-09-23. REU describes itself as Redding's community-owned electric utility, with fees approved by the City Council; Residential Service (E1) since January 1, 2025: $40.00 fixed charge per meter and $0.1492 per kWh.
    • City of Redding — Adopted FY 2025-26 Master Fee Schedule — verified 2026-09-24. Building Division electric permit fees: Photo Voltaic Systems - Residential, 7 to 15 kW $450.00, 16 kW and up $450.00 plus $15.00 per kW above 15 kW (Reso 2025-048, AB 1132); Alternative Power Source Other Than Solar Permit (batteries, generator, wind turbine) $187.50; permit issuance $58.00 per permit. The FY 2026-27 schedule keeps the PV figures and lists $193.00 for the alternative power source line, with building permit fees effective October 19, 2026.
    • California Energy Commission — Electric Load Serving Entities (IOU & POU) service-territory layer — verified 2026-09-23. Overlaid on the Census TIGERweb city boundary to see which utility territories fall inside the city. A map layer, not an address lookup: the bill names the utility for a given home.
    • California Energy Commission — Residential Solar Permitting Program data (SB 379) — verified 2026-09-23. Self-reported platform status per jurisdiction, data last updated August 3, 2026; the CEC says it does not certify compliance. Rows used for the Tier 3 cities: Santa Clara, Clovis, Berkeley, Concord, Richmond, San Clemente, Encinitas, San Marcos, Lakewood, Elk Grove, Mission Viejo, Victorville, Tulare, Yucaipa, Rocklin and Grass Valley (SolarAPP+); Glendale and Santa Barbara (custom platform); Saratoga and Vacaville (Symbium); Napa (without a platform); Gilroy, San Ramon, Redding and Yuba City (SolarAPP+); Windsor and Ventura (Symbium); Redwood City and Cupertino (SolarAPP+); Hollister (without a platform, deadline Sept 2024).

    Before you sign

    In Shasta County the middle half of reported costs spans $3.19 to $5.64 per watt, and roof, panel work, equipment and contract terms explain most of that gap. California Solar Tax and Permit Rules for 2026 covers them, and the tax, lease and disclosure rules a Redding contract follows.

    Frequently asked questions

    How much does solar cost in Redding?

    About $31,800 for a 7.94 kW system, at the $4.00 per watt median that Shasta County owners reported (299 systems, January 2025 to May 2026; middle half $3.19 to $5.64). Source: CPUC DG Stats. No federal credit applies to a Redding system finished in 2026.

    What does a solar permit cost in Redding?

    $450 for a home rooftop system on Redding's published schedule (checked September 24, 2026); the state limit is $450 up to 15 kW under Gov. Code §66015.

    How does Redding Electric Utility credit solar?

    Redding is served by Redding Electric Utility, not PG&E, so PG&E's Solar Billing Plan does not apply. Under REU's Zero Net Energy Service, a solar home is billed monthly for the energy it uses at the applicable retail rate, and power it sends to the grid is credited at what REU calls the current value of solar. REU limits a home system to 1 kW DC for every 1,752 kWh used on site in the previous 12 months, so 12,000 kWh a year allows about 6.85 kW DC, and a system sized beyond on-site demand does not qualify as a net generator. REU's residential rate (E1) has been a $40.00 monthly fixed charge plus $0.1492 per kWh since January 1, 2025.

    Which utility serves Redding?

    Redding Electric Utility (REU). It is not covered by the CPUC's average-rate reports; read its own tariff.

    Sources

    The tax, contract and permit rules every California city shares, with their statutes: California Solar Tax and Permit Rules for 2026.

    Have your bill reviewed

    Start with the utility on your bill and what you pay in a typical month. Contact details come after that. The calculators and checklists on this page stay usable without submitting anything.

    Step 1 of 2 — your bill

    No contact details on this step. Nothing is sent until you submit the second step.

    Submitting does not guarantee a quote, savings, program funding or eligibility.

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Before you send anything

    What this is
    California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
    What happens after the form
    Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
    How you are contacted
    Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
    Using the site without submitting
    The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.