Skip to main content

    Independent information and referral site. Not a utility, contractor or government agency. How we make money

    California solar decisions

    Solar Companies in Redding, CA: Installer Counts and License Checks

    Redding's main electric utility, Redding Electric Utility, is not in the state's solar interconnection data, which covers PG&E, SCE and SDG&E customers only. On the PG&E-served addresses listed as Redding, utility records show 126 home solar systems connected in 2025, led by Sunrun (18), B & B Solar Inc (9) and Electric Solar Solutions Inc (8). It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.

    California Rate Relief is a private solar referral service.

    Key facts

    Electric utility
    Redding Electric Utility
    City-owned; not PG&E
    Redding Electric Utilitychecked Sep 23, 2026
    Size cap
    1 kW DC per 1,752 kWh
    Of on-site use over the previous 12 months
    Redding Electric Utilitychecked Sep 23, 2026
    Average home system
    7.75 kW
    Residential systems in Redding, per REU
    Redding Electric Utilitychecked Sep 23, 2026

    Installers who connected the most home solar systems on PG&E-served Redding addresses in 2025

    Home solar systems per installer at PG&E-served addresses listed as Redding, from utility interconnection records
    Installer (name as reported)Systems in 2025Jan 2024 to May 2026CSLB license
    Sunrun1834750184 check
    B & B Solar Inc920519561 check
    Electric Solar Solutions Inc8201008638 check
    North Valley LLC8111080746 check
    Top Hat Energy Inc815530588 check
    Bright Ops7121020761 check
    Ohm Solar Solutions6181069206 check
    Freedom Forever LLC6201029644 check

    Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026). These are PG&E customers whose service address the utility lists under Redding; Redding Electric Utility customers are not in the data.

    Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).

    Start with your bill

    Or tap a typical amount

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Home solar on PG&E-served Redding addresses by the numbers

    PG&E approved 126 home solar systems at PG&E-served addresses listed as Redding in 2025, from 35 installers; the top three were named on 28% of them. The busiest year since 2021 was 2023, with 291 (2025: -57%). Another 68 were approved from January through May 2026.

    2025 mix: 37% leased or on a power purchase agreement, 64% owned by the household; 44% with a battery; median size 9.06 kW DC.

    Home solar systems connected per year at PG&E-served addresses listed as Redding, 2021 to 2025
    Year20212022202320242025
    Systems connected193226291135126

    Hiring a solar company in Redding

    Redding's electricity comes from Redding Electric Utility, not PG&E, and REU sets the rules a solar company has to follow: a system capped at 1 kW DC per 1,752 kWh of your last year's use, an REU Generator Number before the City will accept the permit, and monthly billing where surplus is credited at REU's value of solar. Compare at least three written bids sized to your own usage.

    Start with your Redding electricity bill

    Redding homes buy electricity from Redding Electric Utility, the City's own utility, not PG&E. REU's Zero Net Energy Service bills a solar home monthly: energy drawn from the grid is charged at the retail rate, and surplus sent to the grid is credited at what REU calls the current value of solar. A proposal built on PG&E's Solar Billing Plan does not describe a Redding bill.

    REU's steps come first

    Redding Electric Utility asks customers to size a system from their own twelve months of use, which you can see by logging into your REU account or calling (530) 339-7200. It will not interconnect a system that exceeds on-site demand as a net generator. The installer submits REU's Solar PV Checklist forms to REU Customer Service, and only after REU approves them and issues a Generator Number will the City's Building Division accept a building permit application.

    REU also sends specifications for a Generator Disconnect nameplate, which must be mounted on the AC disconnect within 10 feet of the meter and in sight of it. The disconnect stays off until the system passes the City's final inspection and REU commissions it; REU personnel switch it on. If the design changes during the City's review, the contractor must send REU revised drawings before the City issues its final. REU's information sheet adds that all equipment needs a manufacturer warranty of at least 10 years and that one project in every seven gets a HERS energy-efficiency inspection.

    Redding's SolarAPP+ conditions

    The City of Redding accepts SolarAPP+ for most residential roof-mounted retrofit systems, from contractors registered with the platform who hold a City business license. For REU customers, the signed interconnection agreement must be uploaded to the City's portal. The design must carry a 30 PSF roof snow load, non-reducible, with roof attachments no more than 48 inches apart and staggered.

    Homes built before 1970 cannot use SolarAPP+. The City has required roofs to resist a 30 PSF snow load since 1970, and for older roofs it adds panel weight only if the roof is reinforced or shown to carry the load. After SolarAPP+ approval, the contractor applies in the City's CSS portal under the Electrical Photovoltaic (SolarAPP) permit, pays the fees and prints the construction ePermit. REU says it does not endorse or partner with any contractor, and recommends talking to at least three.

    What a Redding quote needs to explain

    Local project questions for Redding
    CheckAsk each bidder
    System size capShow the size against REU's limit of 1 kW DC per 1,752 kWh of your prior twelve months' use.
    REU Generator NumberSay who submits REU's Solar PV Checklist and when the Generator Number is expected; the City will not take the permit without it.
    Roof and home ageConfirm the roof is designed for a 30 PSF snow load, and whether a pre-1970 home rules out SolarAPP+ or needs reinforcement.
    Warranty and inverterConfirm every component carries a manufacturer warranty of 10 years or more and the inverter meets REU's listing rules.

    A comparison to ask for

    Before comparing Redding bids, check each system size against your last twelve months of use. REU caps a net-generation system at 1 kW DC for every 1,752 kWh you used; at 12,000 kWh a year that is about 6.85 kW DC. A bid sized above your cap will not be allowed to interconnect as a net generator, and REU says it is not buying solar power under purchase agreements.

    Verify the company behind the Redding quote

    Match the business name and license number on each Redding proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.

    Permit fees and the filing route are on the Redding solar cost and permit page.

    Redding solar quote questions

    Who provides electricity in Redding, CA?

    Redding Electric Utility, a department of the City of Redding. Solar homes are billed under REU's Zero Net Energy Service, not PG&E's Solar Billing Plan.

    How big a solar system can I install in Redding?

    REU limits a net-generation system to 1 kW DC for every 1,752 kWh of on-site use over the previous 12 months, so a home using 12,000 kWh a year could install about 6.85 kW DC. REU says the average residential system in Redding is 7.75 kW.

    Can I use SolarAPP+ for a solar permit in Redding?

    Yes, if the contractor is registered with SolarAPP+, holds a City of Redding business license, uploads the signed REU interconnection agreement, designs for a 30 PSF roof snow load, and the home was built in 1970 or later.

    Before you sign anything in Redding

    Two of the contract terms that most often change what a quote really costs.

    Ask for a competing quote

    Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.

    Step 1 of 2 — your bill

    No contact details on this step. Nothing is sent until you submit the second step.

    Submitting does not guarantee a quote, savings, program funding or eligibility.

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Before you send anything

    What this is
    California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
    What happens after the form
    Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
    How you are contacted
    Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
    Using the site without submitting
    The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.