Solar Companies in Cupertino, CA: Who Installed the Most Systems in 2025
Utility records show 309 home solar systems connected in Cupertino in 2025. Sunrun was the installer of record on 74 of them, followed by Tesla Energy Operations Inc (54) and Cinnamon Energy Systems Inc (23). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Instant Solar Permit
- Temporarily unavailable
- Permits by email to the Permit Center meanwhile
- City of Cupertinochecked Sep 23, 2026
- 2024 solar permits
- 504
- 57% with storage, 39% issued online
- California Energy Commission (SB 379 reports)checked Sep 23, 2026
- Generation
- Silicon Valley Clean Energy
- PG&E delivers and bills
- Silicon Valley Clean Energychecked Sep 23, 2026
Installers who connected the most home solar systems in Cupertino in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Sunrun | 74 | 162 | 750184 check |
| Tesla Energy Operations Inc | 54 | 138 | 888104 check |
| Cinnamon Energy Systems Inc | 23 | 37 | 976065 check |
| Infinium Solar, Inc. | 13 | 21 | 1031953 check |
| Complete Solar Inc | 9 | 9 | 961988 check |
| Sunvault | 8 | 14 | 1058411 check |
| Solar Optimum Design & Electrical | 8 | 17 | 972228 check |
| Your Energy Solutions | 8 | 18 | 928652 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in Cupertino by the numbers
PG&E approved 309 home solar systems in Cupertino in 2025, from 63 installers; the top three were named on 49% of them. The busiest year since 2021 was 2023, with 436 (2025: -29%). Another 197 were approved from January through May 2026.
2025 mix: 25% leased or on a power purchase agreement, 75% owned by the household; 52% with a battery; median size 6.39 kW DC. Santa Clara County: 30% leased or PPA, 54% with a battery, median 6.48 kW.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 262 | 336 | 436 | 313 | 309 |
Hiring a solar company in Cupertino
Solar companies in Cupertino normally get an instant permit through SolarAPP+ and the City's Citizen Access portal, covering rooftop solar with or without a battery. As of September 23, 2026 the City has paused that route during a business license system upgrade and is taking permits by email. PG&E delivers the power and Silicon Valley Clean Energy supplies it. Compare at least three written bids built on your own bill.
Start with your Cupertino electricity bill
Cupertino is a PG&E delivery city, and Silicon Valley Clean Energy is its official generation provider, so a Cupertino solar bill has two halves: SVCE's generation charges and credits, and PG&E's delivery charges and credits. Have each bidder model both from your own statement, with the solar plan that matches when your system is applied for.
Cupertino's Instant Solar Permit, and the pause
The City's Instant Solar Permit covers roof-mounted solar photovoltaic installations with or without energy storage, and a contractor may include a main electrical service upgrade; only systems on the SolarAPP+ eligibility checklists qualify. The route has four steps: register with SolarAPP+, submit the project and pay its processing fee, currently $25, then apply in Citizen Access with the SolarAPP+ approval documents, the SolarAPP+ inspection checklist and the equipment specifications. When the documents are uploaded, fees paid and forms signed, the permit issues automatically, and the inspection is scheduled from the record in Citizen Access.
On September 23, 2026 the City's page said the instant permit was temporarily unavailable because of a business license system upgrade, and that all permits had to be submitted by email to the Permit Center. Revisions already go that way: the City asks for a revised application, updated SolarAPP+ approval documents and a new inspection checklist by email. One inspection fee covers two inspections of the same element; further inspections carry re-inspection fees paid before the final.
What Cupertino's permits and bills look like
Cupertino reported 504 residential solar permits to the Energy Commission for 2024, and 288 of them, about 57%, included battery storage. About 39% were issued online, which reflects how many projects took the instant route rather than regular review.
The bill behind those systems is split. Silicon Valley Clean Energy is the official electricity provider for Cupertino and supplies the generation, while PG&E delivers the power and sends the statement. SVCE says systems applied for after April 14, 2023 are on the Solar Billing Plan, and earlier NEM 2.0 systems keep their terms for 20 years from installation, so a proposal should state which plan it assumes for your home.
What a Cupertino quote needs to explain
| Check | Ask each bidder |
|---|---|
| Permit route | Say whether the job goes through the Instant Solar Permit or, while that is paused, by email to the Permit Center, and the expected wait. |
| What to upload | List the SolarAPP+ approval documents, inspection checklist and equipment specifications the City requires. |
| Inspections | State how many inspections the schedule assumes; re-inspections beyond two for the same element carry a fee. |
| SVCE and PG&E | Model SVCE generation credits and PG&E delivery charges separately. |
Related Cupertino project questions
Use these guides to prepare the specific questions a written bid needs to answer.
A comparison to ask for
Cupertino homes put a battery on more than half of their 2024 solar permits, so expect most bids to include one. Ask each bidder for the battery's usable kWh and backed-up circuits, whether a main service upgrade is part of the same permit, and how many inspections its schedule assumes, since the City's inspection fee covers two visits for the same element and a third costs extra.
Verify the company behind the Cupertino quote
Match the business name and license number on each Cupertino proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.
Permit fees and the filing route are on the Cupertino solar cost and permit page.
Cupertino solar quote questions
How do I get an instant solar permit in Cupertino?
Normally, a licensed contractor registers with SolarAPP+, submits the project, pays the $25 processing fee and downloads the approval, then applies in the City's Citizen Access portal with the approval documents, inspection checklist and equipment specifications. Once fees are paid and forms signed, the permit issues automatically. The City says the instant permit is temporarily unavailable during a business license system upgrade, so permits are being emailed to permitcenter@cupertino.gov.
Does a battery need its own permit in Cupertino?
Not on the instant route. The City's Instant Solar Permit covers roof-mounted solar with or without energy storage, and a main electrical service upgrade can be included, as long as the system is on the SolarAPP+ eligibility checklists.
How many solar permits does Cupertino issue?
The City reported 504 residential solar permits to the California Energy Commission for 2024. Of those, 288 included battery storage and 197, about 39%, were issued online.
Who supplies electricity in Cupertino?
PG&E delivers it and sends the bill, and Silicon Valley Clean Energy is the official generation provider for Cupertino, one of the 13 communities it serves.
Before you sign anything in Cupertino
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.