Independent information and referral site. Not a utility, contractor or government agency. Figures link to their sources. How we make money
California solar decisions
Solar Companies in San Ramon, CA: Who Installed the Most Systems in 2025
Utility records show 500 home solar systems connected in San Ramon in 2025. Tesla Energy Operations Inc was the installer of record on 109 of them, followed by Citadel Roofing and Solar (84) and Sunrun (79). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- 2024 permits issued online
- All 694
- Only 27 included battery storage
- California Energy Commission (SB 379 reports)checked Sep 23, 2026
- Contractor gates
- Business license + eligibility list
- Before the Electrical Photovoltaic (SolarAPP) permit
- City of San Ramonchecked Sep 23, 2026
Installers who connected the most home solar systems in San Ramon in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Tesla Energy Operations Inc | 109 | 244 | 888104 check |
| Citadel Roofing and Solar | 84 | 208 | 647149 check |
| Sunrun | 79 | 159 | 750184 check |
| Your Energy Solutions | 18 | 46 | 928652 check |
| Sunpower Corporation Systems | 16 | 117 | 890895 check |
| Bright Ops | 15 | 22 | 1020761 check |
| Got Watts Electric, Solar & HVAC | 9 | 24 | 985920 check |
| Axia Solar Corp | 8 | 15 | 1090641 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in San Ramon by the numbers
PG&E approved 500 home solar systems in San Ramon in 2025, from 79 installers; the top three were named on 54% of them. The busiest year since 2021 was 2023, with 1,037 (2025: -52%). Another 198 were approved from January through May 2026.
2025 mix: 23% leased or on a power purchase agreement, 77% owned by the household; 58% with a battery; median size 6.61 kW DC. Contra Costa County: 43% leased or PPA, 58% with a battery, median 6.48 kW.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 751 | 899 | 1,037 | 508 | 500 |
Hiring a solar company in San Ramon
Solar companies installing in San Ramon use SolarAPP+ and the City's Citizen Self Service portal, and need an active San Ramon business license and a place on the City's SolarAPP+ eligibility list first. The City issued all 694 of its 2024 residential solar permits online. PG&E delivers the power, and the Energy Commission's map shows MCE as the generation provider. Compare at least three written bids built on your own bill.
Start with your San Ramon electricity bill
San Ramon homes are on PG&E's wires, and the California Energy Commission's map shows MCE as the community choice provider over the whole city, supplying generation by default while PG&E delivers the power and sends the bill. Check the generation lines on your own statement, then have each bidder model that provider's export credits and PG&E's delivery charges separately.
San Ramon's two permit paths
For the automated path, the City's SolarAPP+ page follows a set order. The contractor registers with SolarAPP+, submits the design for automated review of a residential, roof-mounted retrofit system and pays SolarAPP+'s processing fee, then downloads the approved plans. Before applying to the City it needs an active San Ramon business license and must be added to the City's SolarAPP+ eligibility list by emailing the Permit Center. The City permit is an Electrical Photovoltaic (SolarAPP) permit filed in the CSS portal, and inspections are requested from the same CSS account.
Projects outside SolarAPP+ go through regular submittal. The plot plan must show the site to scale, lot dimensions, setbacks, driveways, adjacent streets and the panel locations. The installation details must give the panel weight, number of panels, area covered, UL listings, the existing roofing type and weight, and how the supports attach to the structure. When the installation weighs more than 5 pounds per square foot, structural calculations are required. The City also advises checking zoning with the Planning Division before any project starts.
Why San Ramon's permit numbers look different
San Ramon reported 1,074 residential solar permits to the California Energy Commission for 2023 and 694 for 2024, and every one in both years was issued online. The storage share stayed low: 22 permits with a battery in 2023 and 27 in 2024, about 4%. In nearby Danville, by comparison, 78% of 2024 permits included storage.
That gap is worth a question. On PG&E's Solar Billing Plan, credits for exported power vary by time of day, day of the week and season, and PG&E says customers save the most when they use what they produce on-site. A system without storage exports more of its midday output, so a panels-only bid should show how much of your usage it covers directly and what the remaining PG&E and MCE bill would be.
What a San Ramon quote needs to explain
| Check | Ask each bidder |
|---|---|
| City conditions | Confirm an active San Ramon business license and a spot on the City's SolarAPP+ eligibility list. |
| Zoning | Say whether the Planning Division was asked about zoning before the permit, as the City advises. |
| Roof weight | If panels weigh more than 5 pounds per square foot, show the structural calculations the City requires. |
| MCE and PG&E | Model the generation provider on your bill and PG&E delivery separately. |
Related San Ramon project questions
Use these guides to prepare the specific questions a written bid needs to answer.
A comparison to ask for
San Ramon reported every one of its 694 residential solar permits for 2024 as issued online, and only 27 of them included a battery. If one bidder quotes panels only and another adds a battery, ask both to show your PG&E and MCE bill with and without storage, so you can see what the battery adds for your usage rather than for an average home.
Verify the company behind the San Ramon quote
Match the business name and license number on each San Ramon proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.
Permit fees and the filing route are on the San Ramon solar cost and permit page.
San Ramon solar quote questions
How do I get a solar permit in San Ramon?
A licensed contractor submits the design to SolarAPP+ for automated review and pays its processing fee, then, with an active San Ramon business license and a place on the City's SolarAPP+ eligibility list, applies for an Electrical Photovoltaic (SolarAPP) permit in the City's CSS portal and requests the inspection there.
What if my San Ramon project doesn't qualify for SolarAPP+?
It goes through regular plan submittal. The City asks for a plot plan showing the panels, lot dimensions and setbacks, and installation details including panel weight, number and area, roofing type and weight and the attachment method. Structural calculations are required when the installation weighs more than 5 pounds per square foot.
How many solar permits does San Ramon issue?
The City reported 1,074 residential solar permits to the California Energy Commission for 2023 and 694 for 2024, all of them issued online. Only 27 of the 2024 permits included battery storage.
Who supplies electricity in San Ramon?
PG&E delivers it and sends the bill. On the Energy Commission's map, MCE is the community choice provider over San Ramon, supplying generation by default; the name on your bill's generation lines is the one a proposal should use.
Before you sign anything in San Ramon
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.