Independent information and referral site. Not a utility, contractor or government agency. Figures link to their sources. How we make money
California solar decisions
Solar Companies in Berkeley, CA: Who Installed the Most Systems in 2025
Utility records show 307 home solar systems connected in Berkeley in 2025. A1 Sun Inc was the installer of record on 39 of them, followed by Sun Light & Power (23) and Sunrun (23). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Real-time permit
- SolarAPP+
- Single-family and duplex solar and storage
- City of Berkeleychecked Sep 23, 2026
- Standard review
- Within 1 working day
- For projects outside SolarAPP+ and the streamlined route
- City of Berkeleychecked Sep 23, 2026
- Ava export bonus
- +$0.025/kWh, 3 to 8 p.m.
- Solar Billing Plan customers not on CARE or FERA
- Ava Community Energychecked Sep 23, 2026
Installers who connected the most home solar systems in Berkeley in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| A1 Sun Inc | 39 | 97 | 891743 check |
| Sun Light & Power | 23 | 55 | 326203 check |
| Sunrun | 23 | 55 | 750184 check |
| Solar Technologies | 14 | 44 | 932914 check |
| Got Watts Electric, Solar & HVAC | 12 | 19 | 985920 check |
| Albion Power Company Inc | 9 | 19 | 878027 check |
| Sunpower Corporation Systems | 8 | 40 | 890895 check |
| Tesla Energy Operations Inc | 7 | 16 | 888104 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in Berkeley by the numbers
PG&E approved 307 home solar systems in Berkeley in 2025, from 84 installers; the top three were named on 28% of them. The busiest year since 2021 was 2023, with 810 (2025: -62%). Another 206 were approved from January through May 2026.
2025 mix: 11% leased or on a power purchase agreement, 89% owned by the household; 26% with a battery; median size 5.41 kW DC. Alameda County: 33% leased or PPA, 53% with a battery, median 5.79 kW.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 463 | 563 | 810 | 408 | 307 |
Hiring a solar company in Berkeley
Berkeley permits most home solar and battery projects in real time through SolarAPP+, offers a streamlined permit for systems of 10 kW AC or less that pass its checklist, and says it reviews standard applications within one working day. Ava Community Energy supplies Berkeley's generation and PG&E delivers it. Compare at least three written bids that name the permit route and model your own Ava and PG&E bill.
Start with your Berkeley electricity bill
Berkeley homes get generation from Ava Community Energy and delivery from PG&E, which sends the bill; the Energy Commission's map places the city's land in both areas. Ava and PG&E settle their halves of a solar account separately, Ava in April and PG&E on its own date. Ask each bidder to model both, using your current Ava plan and PG&E rate.
Berkeley's three solar permit routes
The City says it encourages solar and storage through minimal permit fees, standardized guidelines and online applications. For SolarAPP+, the installer registers with the platform, submits the design, and then creates a record in Berkeley's Permits Online; the City notes that most residential solar and storage systems qualify, subject to SolarAPP+'s eligibility rules.
The streamlined route is for small rooftop systems, 10 kW AC or less, on a single-family home or duplex, where every item on the City's eligibility checklist can be marked Yes. The applicant submits the code compliance checklist, the permit application, a schematic site plan, the City's standard plan for either string or central inverters or microinverters, and its structural criteria for flush-mounted arrays, online or by appointment at the Permit Service Center. Larger or unusual projects use the standard process with full plans, and the City says it reviews those within one working day.
How Ava credits a Berkeley solar system
Berkeley is in Ava's service area. For a system interconnected now, Ava's version of the Solar Billing Plan applies, and it only works alongside PG&E's all-electric E-ELEC rate, which Ava makes a condition. The credit for each exported kWh depends on the hour it leaves the house. Ava pays a premium for evening exports, from 3 to 8 p.m., if you are not on a discount program, while households on CARE or FERA get a smaller premium on every exported kWh instead.
The two halves of the account close on different calendars: Ava reconciles generation every April, and PG&E reconciles delivery on its own annual date. A Berkeley proposal should therefore show two annual statements, not one, and say which hours of the day it expects your panels to feed the grid.
What a Berkeley quote needs to explain
| Check | Ask each bidder |
|---|---|
| Permit route | Name the route: SolarAPP+ and Permits Online, the streamlined checklist, or the standard process at the Permit Service Center. |
| Ava and PG&E bill | Model Ava generation and PG&E delivery, and the E-ELEC rate Ava requires on the Solar Billing Plan. |
| Export timing | Show how many exported kWh fall between 3 and 8 p.m., the hours Ava pays extra for. |
| Contract and service | Name the contracting business, its CSLB license and who handles service calls after installation. |
A comparison to ask for
Ask each Berkeley bidder which of the City's three routes it is using and why. A 10 kW AC or smaller system on a single-family home or duplex should normally fit SolarAPP+ or the streamlined checklist; if a bid plans the standard process, ask what in the design, such as the roof structure or the battery, rules the faster routes out.
Verify the company behind the Berkeley quote
Match the business name and license number on each Berkeley proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.
Permit fees and the filing route are on the Berkeley solar cost and permit page.
Berkeley solar quote questions
How do I get a solar permit in Berkeley?
Most single-family and duplex solar and battery projects can get a real-time permit through SolarAPP+ and a record in the City's Permits Online. Systems of 10 kW AC or less that pass the City's eligibility checklist can use the streamlined process, and other projects use the standard process at the Permit Service Center.
How long does Berkeley take to review a solar permit?
SolarAPP+ approvals are real-time. For projects on the standard permit process, the City says it reviews them within one working day.
Who supplies electricity in Berkeley?
Ava Community Energy supplies generation for most Berkeley homes; PG&E delivers the power and sends the bill.
Before you sign anything in Berkeley
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.