Skip to main content

    Independent information and referral site. Not a utility, contractor or government agency. How we make money

    California solar decisions

    Solar Companies in Hollister, CA: Who Installed the Most Systems in 2025

    Utility records show 481 home solar systems connected in Hollister in 2025. Sunrun was the installer of record on 162 of them, followed by Citadel Roofing and Solar (128) and Complete Solar Inc (48). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.

    California Rate Relief is a private solar referral service.

    Key facts

    Generation
    Central Coast Community Energy
    PG&E delivers and bills
    California Energy Commissionchecked Sep 23, 2026
    3CE true-up
    December
    NSC $0.023/kWh in the PG&E area (NEM tariffs)
    Central Coast Community Energychecked Sep 23, 2026
    Automated platform
    None reported
    Hollister's SB 379 status with the Energy Commission
    California Energy Commissionchecked Sep 23, 2026

    Installers who connected the most home solar systems in Hollister in 2025

    Home solar systems per installer in Hollister, from utility interconnection records
    Installer (name as reported)Systems in 2025Jan 2024 to May 2026CSLB license
    Sunrun162312750184 check
    Citadel Roofing and Solar128243647149 check
    Complete Solar Inc4849961988 check
    Bright Ops33731020761 check
    Tesla Energy Operations Inc1834888104 check
    Freedom Forever LLC11331029644 check
    ESP Contracting710619149 check
    L G C Y Electric771099095 check

    Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).

    Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).

    Start with your bill

    Or tap a typical amount

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Home solar in Hollister by the numbers

    PG&E approved 481 home solar systems in Hollister in 2025, from 49 installers; the top three were named on 70% of them. The busiest year since 2021 was 2022, with 725 (2025: -34%). Another 202 were approved from January through May 2026.

    2025 mix: 39% leased or on a power purchase agreement, 61% owned by the household; 34% with a battery; median size 4.25 kW DC. San Benito County: 39% leased or PPA, 36% with a battery, median 4.37 kW.

    Home solar systems connected per year in Hollister, 2021 to 2025
    Year20212022202320242025
    Systems connected605725716506481

    Hiring a solar company in Hollister

    Solar companies in Hollister connect a home system to PG&E, with Central Coast Community Energy supplying the generation and truing up solar credits every December. The City reported no automated online solar permit platform to the Energy Commission, so expect a regular permit through the Building Division, which works by appointment. Compare at least three written bids built on your own 3CE and PG&E bill.

    Start with your Hollister electricity bill

    Hollister is PG&E delivery territory and Central Coast Community Energy (3CE) generation territory across the whole city on the California Energy Commission's maps. A 3CE solar customer has two true-ups a year: one with PG&E for delivery and one with 3CE, every December, for generation. Have each bidder model both halves from your own bill, under the solar plan that matches your interconnection date.

    How 3CE settles a Hollister solar account

    3CE handles generation and PG&E handles transmission and distribution, so a 3CE customer on a Net Energy Metering tariff sees PG&E's minimum monthly delivery charges and gets two true-ups each year. 3CE bills monthly for energy used beyond what the system produces, gives retail credits for extra generation within the true-up period, and trues up every December. At that point customers receive credit for earlier generation charges before retail credits accrue, and Net Surplus Compensation as a bill credit.

    3CE's Net Surplus Compensation rate in the PG&E service area is $0.023 per kWh. A residential customer with at least $200 in retail credits and surplus compensation combined can ask for a check within 45 days of the true-up statement; otherwise the amount stays as bill credit. Customers whose interconnection agreement was approved after April 15, 2023 are on the Net Billing Tariff instead, so ask the bidder which one your system will be on.

    Hollister's permit office

    The City told the Energy Commission it has no automated solar permitting platform, and it has not filed an annual SB 379 permit report, so there is no published count of Hollister solar permits or of how many were issued online. Its solar permit page provides the building permit application, and the Building Division, at 339 Fifth Street, takes appointments through an online booking link.

    Homes outside the city limits are permitted by San Benito County, which the Energy Commission lists as exempt from the SB 379 requirement but as having a SolarAPP+ platform. If pigeons nesting under panels are a concern, ask each bidder to price critter guards as a separate line rather than assuming they are included.

    What a Hollister quote needs to explain

    Local project questions for Hollister
    CheckAsk each bidder
    3CE and PG&EModel 3CE's December generation true-up and PG&E's delivery true-up separately.
    Permit filingSay how the permit will be filed with the Building Division and the expected review time.
    Roof and birdsSay whether bird-proofing mesh and roof repairs are included or priced separately.
    BatteryPrice the battery as its own line, with usable kWh and backed-up circuits.

    Related Hollister project questions

    Use these guides to prepare the specific questions a written bid needs to answer.

    A comparison to ask for

    3CE settles generation credits in December, so a proposal that shows a year-end credit should say whether you would take it as a bill credit or, above the check threshold, as a check. Ask each bidder to separate 3CE's generation credits from PG&E's delivery charges in its estimate.

    Verify the company behind the Hollister quote

    Match the business name and license number on each Hollister proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.

    Permit fees and the filing route are on the Hollister solar cost and permit page.

    Hollister solar quote questions

    What are the best solar companies in Hollister?

    This site does not rank them. Shortlist companies with a CSLB license covering solar that have filed Hollister permits recently and confirm your address in writing, then compare at least three written bids for the same system built on your 3CE and PG&E bill.

    Who supplies electricity in Hollister?

    PG&E delivers it and sends the bill, and Central Coast Community Energy supplies the generation by default; the Energy Commission's maps show both across the whole city.

    When does 3CE pay for surplus solar?

    For customers on 3CE's Net Energy Metering tariffs, 3CE trues up generation every December and pays Net Surplus Compensation as a bill credit, at $0.023 per kWh in the PG&E service area. Residential customers whose retail credits and surplus compensation total at least $200 can instead request a check within 45 days of the true-up statement.

    Does Hollister have instant solar permits?

    The City reported to the Energy Commission that it has no automated solar permitting platform, and it has not filed an annual permit report in the Commission's data file. Expect a regular permit review, and ask each bidder how long its recent Hollister permits took.

    Before you sign anything in Hollister

    Two of the contract terms that most often change what a quote really costs.

    Ask for a competing quote

    Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.

    Step 1 of 2 — your bill

    No contact details on this step. Nothing is sent until you submit the second step.

    Submitting does not guarantee a quote, savings, program funding or eligibility.

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Before you send anything

    What this is
    California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
    What happens after the form
    Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
    How you are contacted
    Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
    Using the site without submitting
    The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.