Skip to main content

    Independent information and referral site. Not a utility, contractor or government agency. How we make money

    California solar decisions

    Solar Companies in Pasadena, CA: Installer Counts and License Checks

    Pasadena's main electric utility, Pasadena Water and Power, is not in the state's solar interconnection data, which covers PG&E, SCE and SDG&E customers only. On the SCE-served addresses listed as Pasadena, utility records show 61 home solar systems connected in 2025, led by Solar Optimum Design & Electrical (4), Sunrun (4) and Axia Solar Corp (4). It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.

    California Rate Relief is a private solar referral service.

    Key facts

    Electric utility
    Pasadena Water and Power
    Municipal; about 99% of city land on the CEC map
    California Energy Commissionchecked Sep 23, 2026
    PWP size cap
    150% of annual use
    Or 2 W DC per sq ft for new or expanded space
    Pasadena Water and Powerchecked Sep 23, 2026
    Top distribution tier
    25.233¢/kWh
    Above 750 kWh a month, effective July 1, 2026
    Pasadena Water and Powerchecked Sep 23, 2026

    Installers who connected the most home solar systems on SCE-served Pasadena addresses in 2025

    Home solar systems per installer at SCE-served addresses listed as Pasadena, from utility interconnection records
    Installer (name as reported)Systems in 2025Jan 2024 to May 2026CSLB license
    Solar Optimum Design & Electrical46972228 check
    Sunrun416750184 check
    Axia Solar Corp471090641 check
    Sun Bees Groups Inc DBA True Power Solar45970591 check
    Altadena Energy & Solar Inc48979146 check

    Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026). These are SCE customers whose service address the utility lists under Pasadena; Pasadena Water and Power customers are not in the data.

    Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).

    Start with your bill

    Or tap a typical amount

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Home solar on SCE-served Pasadena addresses by the numbers

    SCE approved 61 home solar systems at SCE-served addresses listed as Pasadena in 2025, from 35 installers; the top three were named on 20% of them. The busiest year since 2021 was 2023, with 103 (2025: -41%). Another 26 were approved from January through May 2026.

    2025 mix: 21% leased or on a power purchase agreement, 79% owned by the household; 79% with a battery; median size 7.05 kW DC.

    Home solar systems connected per year at SCE-served addresses listed as Pasadena, 2021 to 2025
    Year20212022202320242025
    Systems connected49651036161

    Hiring a solar company in Pasadena

    In Pasadena the utility, not the City, is the first gate for any solar company: Pasadena Water and Power must approve the project through its PowerClerk system before a building permit can be issued, and it caps a system at 150% of your average annual use. PWP bills a tiered rate and sets its own solar rules, so compare at least three written bids that model your own PWP bills, not SCE's.

    Start with your Pasadena electricity bill

    Pasadena Water and Power, the City's own utility, bills almost all of Pasadena; the Energy Commission's map shows a small SCE area at the edge of the city. PWP charges a tiered rate, effective July 1, 2026: a $17.50 monthly Customer and Grid Access Charge, energy and transmission charges on every kWh, and a distribution charge that climbs from 3.505 cents for the first 350 kWh to 25.233 cents above 750 kWh. A proposal built on SCE or PG&E rates is not a Pasadena proposal.

    PWP's approval comes before the building permit

    Pasadena reverses the order many homeowners expect. PWP's eligibility rules require its initial review approval before anyone applies for a building permit, and the installer, not the homeowner, submits the application online through PWP's PowerClerk system. The package includes a single-line diagram, a site plan, the signed contract between you and the installer, a copy of your PWP bill, the Net Metering and Surplus Compensation enrollment form, the interconnection agreement, your billing history or square-footage verification, and an HOA approval letter where one applies.

    The agreement depends on size. Systems up to 15 kW sign PWP's Small Solar Generator Interconnection Agreement; larger ones sign the Qualifying Facility Interconnection Agreement and must carry insurance. If you add a battery, PWP counts the combined solar and storage inverter ratings toward that 15 kW line, so a battery can move an otherwise small job into the larger agreement. PWP's solar desk is at PWPSolar@cityofpasadena.net or (626) 744-4495.

    PWP's equipment and sizing rules

    PWP will not approve a system sized to produce more than 150% of your average annual consumption on its billing record for the year before you apply; for new or expanded space it uses 2 watts DC per square foot of conditioned floor area instead. Every system must fall between 1 kW and 1,000 kW CEC-AC, use new equipment from the California Energy Commission's eligible equipment lists, carry at least a 10-year warranty, and have an AC manual disconnect within 8 feet and in line of sight of the PWP meter.

    Those rules settle arguments before they start. If one bidder proposes a much larger system than another, ask it to show the PWP billing history behind the size. If a bid does not say where the disconnect goes or how long the warranty runs, it has not been written for PWP.

    What a Pasadena quote needs to explain

    Local project questions for Pasadena
    CheckAsk each bidder
    PWP size limitShow the system is no more than 150% of your average annual use on PWP's billing record, or 2 W DC per square foot for new or expanded space.
    Interconnection agreementName the PWP agreement: up to 15 kW (solar plus storage inverters) or the larger Qualifying Facility agreement with insurance.
    Equipment and warrantyUse equipment on the CEC eligible lists and state the warranty, which PWP requires to be at least 10 years.
    Tiered billModel your own PWP tiers month by month, not a single average rate.

    A comparison to ask for

    Because PWP's distribution charge is tiered, the first kWh your panels offset each month are the most expensive ones you buy. Ask two bidders to show your last twelve PWP bills, how many kWh each month fell in the 25.233-cent tier, and how much of that their system removes. A bid that values every offset kWh at one average price is guessing.

    Verify the company behind the Pasadena quote

    Match the business name and license number on each Pasadena proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.

    Permit fees and the filing route are on the Pasadena solar cost and permit page.

    Pasadena solar quote questions

    Who supplies electricity in Pasadena?

    Pasadena Water and Power, the City's municipal utility, serves nearly all of Pasadena on the Energy Commission's service-territory map. It sets its own rates and solar rules, so the CPUC's Net Billing Tariff for PG&E, SCE and SDG&E does not apply to a PWP account.

    How big can a solar system be in Pasadena?

    PWP limits a system to 150% of your average annual electricity use on its billing record for the prior year, or 2 watts DC per square foot of conditioned floor area for new or expanded space, within a range of 1 kW to 1,000 kW CEC-AC.

    Do I need PWP's approval before the City permit?

    Yes. PWP's eligibility rules say the customer must obtain PWP's initial review approval before applying for building permits.

    What are electricity rates in Pasadena?

    Pasadena Water and Power's residential rate, effective July 1, 2026, has a $11.00 customer charge and a $6.50 grid access charge each month ($17.50 together), an energy charge of 10.0825 cents per kWh, a transmission charge of 1.609 cents, and a tiered distribution charge of 3.505 cents for the first 350 kWh, 14.018 cents for the next 400 and 25.233 cents above that. Added together, a kWh costs about 15.2 cents in the first tier and about 36.9 cents above 750 kWh a month, before anything else on the bill.

    Can I choose a different electricity supplier in Pasadena?

    Not the way many Los Angeles County cities can. The California Energy Commission's map shows Pasadena Water and Power serving about 98% of the city, a small SCE area at the edge, and no community choice provider over the city, so there is no second generation supplier to compare. What you can compare is PWP's rate with the terms in each solar proposal.

    Before you sign anything in Pasadena

    Two of the contract terms that most often change what a quote really costs.

    Ask for a competing quote

    Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.

    Step 1 of 2 — your bill

    No contact details on this step. Nothing is sent until you submit the second step.

    Submitting does not guarantee a quote, savings, program funding or eligibility.

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Before you send anything

    What this is
    California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
    What happens after the form
    Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
    How you are contacted
    Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
    Using the site without submitting
    The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.