Independent information and referral site. Not a utility, contractor or government agency. Figures link to their sources. How we make money
California solar decisions
Solar Companies in Bellflower, CA: Who Installed the Most Systems in 2025
Utility records show 122 home solar systems connected in Bellflower in 2025. Sunrun was the installer of record on 27 of them, followed by Skyline Smart Energy (12) and Bright Ops (11). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Roof certification
- C-39 roofer, before and after
- At least a 1-year leak warranty; effective Jan. 1, 2026
- City of Bellflowerchecked Sep 23, 2026
- Plan review portal
- Willdan Geocivix
- Plan check number by email first; fees paid at City Hall
- City of Bellflowerchecked Sep 23, 2026
Installers who connected the most home solar systems in Bellflower in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Sunrun | 27 | 66 | 750184 check |
| Skyline Smart Energy | 12 | 16 | 1028741 check |
| Bright Ops | 11 | 18 | 1020761 check |
| Solarmax Renewable Energy Provider Inc | 9 | 10 | 972048 check |
| Tesla Energy Operations Inc | 7 | 17 | 888104 check |
| Isaac Hamodot | 6 | 6 | 1071940 check |
| Freedom Forever LLC | 4 | 25 | 1029644 check |
| SWSS Electrical | 4 | 5 | 1004667 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in Bellflower by the numbers
SCE approved 122 home solar systems in Bellflower in 2025, from 40 installers; the top three were named on 41% of them. The busiest year since 2021 was 2023, with 209 (2025: -42%). Another 59 were approved from January through May 2026.
2025 mix: 52% leased or on a power purchase agreement, 48% owned by the household; 81% with a battery; median size 6.39 kW DC. Los Angeles County: 47% leased or PPA, 79% with a battery, median 6.56 kW.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 75 | 129 | 209 | 140 | 122 |
Hiring a solar company in Bellflower
Solar companies in Bellflower face roof rules that took effect January 1, 2026: a C-39 roofing contractor must certify the roof before and after the install, with a one-year leak warranty, and the owner must authorize the permit in writing. Plans are reviewed through the City's Willdan Geocivix portal, and fees are paid in person. SCE supplies and delivers the power. Compare at least three written bids built on your own SCE bill.
Start with your Bellflower electricity bill
Bellflower is Southern California Edison territory for both generation and delivery: the California Energy Commission's map shows no community choice provider over the city. A new system goes on SCE's Solar Billing Plan, so each proposal should use SCE's hourly export credits and your own twelve months of SCE usage.
Bellflower's 2026 roof and permit requirements
The City's minimum additional requirements for solar PV permits took effect on January 1, 2026. Before the permit is issued, the property owner must authorize it in writing, and the plans must describe the existing roof framing, with member types, sizes, spans and spacing, and verify that the roof will carry the new system, adding framing plans for any strengthening. At plan check, a C-39 roofing contractor must confirm in writing that the roof covering shows no deterioration and is in good condition; that step is waived if a complete re-roof permit was issued and finaled within the past five years.
Before the final building inspection, a C-39 roofing contractor must confirm in writing that the whole roof is in acceptable condition after the installation and was not compromised, with at least a one-year warranty against leaks or product replacement. Any electrical work beyond the direct connection into the existing panel must be done by a licensed individual or electrical contractor, and any related gas or water plumbing by licensed plumbers. The Building Official can waive requirements only for cause.
Filing, fees and inspections
The process starts by email: the applicant sends the solar application to the City's permit technicians and receives a plan check number. Plans are then uploaded to the Willdan Geocivix portal as multi-page PDFs by discipline, with calculations and specifications as separate files, and review comments come back by email for resubmittal through the same portal. Plan check and permit fees are paid after approval, in person at City Hall, at an appointment with the Building Counter, where the approved sets are stamped and the permit and job card are issued.
Inspections are requested by phone once the permit is issued, by 3 p.m. for a next-business-day attempt. On the utility side, a new system goes on SCE's Solar Billing Plan: export credits vary by hour and season, SCE locks their values for nine years from the year you start, and customers who enroll before 2028 get a bonus credit of about $0.04 per kWh, or about $0.09 if income-qualified.
What a Bellflower quote needs to explain
| Check | Ask each bidder |
|---|---|
| Roof certification | Name the C-39 roofing contractor who certifies the roof at plan check and after installation, and include the one-year leak warranty. |
| Structural verification | Show the existing roof framing and confirm it supports the array, with any strengthening details. |
| Owner authorization | Include the City's letter of authorization signed by the property owner. |
| SCE billing | Model SCE's Solar Billing Plan from your own bill, with the nine-year credit lock. |
Related Bellflower project questions
Use these guides to prepare the specific questions a written bid needs to answer.
A comparison to ask for
Because Bellflower requires a roofing contractor's sign-off before and after the install, ask every bidder who provides it: its own C-39 license, a roofing partner, or you. A bid that leaves the roof certification out, or that assumes a recent re-roof you do not have, is not comparable with one that includes it.
Verify the company behind the Bellflower quote
Match the business name and license number on each Bellflower proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.
Bellflower solar quote questions
How do I get a solar permit in Bellflower?
The applicant emails the solar application to the City to get a plan check number, then uploads the plans in the Willdan Geocivix portal for review. After approval, the applicant prints two approved sets, makes an appointment with the Building Counter, pays the plan check and permit fees in person at City Hall, and receives the permit and job card.
Why does Bellflower require a roofer to certify my roof?
The City says its 2026 requirements address life-safety concerns from roof water leaks. A C-39 roofing contractor must confirm in writing at plan check that the roof covering is in good condition, and again before the final inspection that the roof was not compromised, with at least a one-year warranty against leaks. The first certification is waived if a complete re-roof permit was issued and finaled in the past five years.
How do I schedule a solar inspection in Bellflower?
By phone, at (562) 804-1424 extension 2230, once the permit is issued. Requests must be made by 3 p.m.; the City tries to schedule the inspection for the next business day but does not guarantee it.
Who supplies electricity in Bellflower?
SCE supplies and delivers it. The California Energy Commission's map shows no community choice provider over Bellflower, so SCE's Solar Billing Plan sets the solar credits.
Before you sign anything in Bellflower
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.