Independent information and referral site. Not a utility, contractor or government agency. Figures link to their sources. How we make money
California solar decisions
Solar Companies in Glendale, CA: Installer Counts and License Checks
Glendale's main electric utility, Glendale Water & Power, is not in the state's solar interconnection data, which covers PG&E, SCE and SDG&E customers only. The table below covers Los Angeles County instead: 16,116 systems in 2025, led by Sunrun (3,924), Bright Ops (972) and Tesla Energy Operations Inc (844). It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Electric utility
- Glendale Water & Power
- Municipal; about 99% of city land on the CEC map
- California Energy Commissionchecked Sep 23, 2026
- Size cap exemption
- Up to 10 kW CEC-AC
- Exempt from the 110% usage cap since Nov. 1, 2023
- Glendale Water & Powerchecked Sep 23, 2026
- GWP application review
- 3 to 5 business days
- Before the City building permit
- Glendale Water & Powerchecked Sep 23, 2026
Installers who connected the most home solar systems in Los Angeles County in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Sunrun | 3,924 | 8,575 | 750184 check |
| Bright Ops | 972 | 1,704 | 1020761 check |
| Tesla Energy Operations Inc | 844 | 2,044 | 888104 check |
| Freedom Forever LLC | 510 | 1,926 | 1029644 check |
| Solara Home Energy LLC | 473 | 699 | 1103958 check |
| Energy Service Partners Inc DBA ESP Contracting | 428 | 862 | 619149 check |
| Sunpower Corporation Systems | 380 | 2,138 | 890895 check |
| V3 Electric Inc | 336 | 599 | 1000573 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026). The data set covers PG&E, SCE and SDG&E customers only, so in Los Angeles County it counts the areas SCE serves.
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in Los Angeles County by the numbers
SCE approved 16,116 home solar systems in Los Angeles County in 2025, from 613 installers; the top three were named on 36% of them. The busiest year since 2021 was 2023, with 28,035 (2025: -43%). Another 7,647 were approved from January through May 2026.
2025 mix: 47% leased or on a power purchase agreement, 53% owned by the household; 79% with a battery; median size 6.56 kW DC.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 13,880 | 22,118 | 28,035 | 16,859 | 16,116 |
Hiring a solar company in Glendale
In Glendale, the utility approves a solar project before the City does: Glendale Water & Power reviews the contractor's PowerClerk application in 3 to 5 business days, then Building and Safety issues the permit, and after inspection GWP reprograms the meter in 7 to 10 working days. GWP sets its own net metering and sizing rules, so compare at least three written bids built on your own GWP bills.
GWP's approval, then the City's permit
Glendale Water & Power publishes the sequence for a residential system under 15 kW CEC-AC. The contractor submits the interconnection application, with storage if any, through PowerClerk, together with a signed Interconnection Agreement whose CEC-AC rating matches PowerClerk's calculation, an executed election form, a complete plan set with equipment data sheets and photos of the service panel, a spot drawing if the panel is being upgraded, and a shading report (waived for systems of 10 kW CEC-AC or less). Since January 19, 2026, GWP accepts only its Interconnection Agreement dated January 1, 2026.
GWP reviews the application in 3 to 5 business days and then directs the contractor to submit the plan set to Building and Safety through the Glendale Permits portal, where building, electrical and fire staff review it and the permit fees are paid; Building and Safety is at (818) 548-3200. The contractor schedules the inspection through Glendale Permits. After it passes, GWP Engineering sends a work order to its field crews to reprogram the meter for net metering, which takes 7 to 10 working days, and then the system gets permission to operate.
GWP's sizing and storage rules
Since November 1, 2023, residential and commercial systems up to 10 kW CEC-AC are exempt from GWP's 110% historical-usage cap, and a system of that size may be paired with up to 30 kWh of storage. The contractor self-certifies the sizing need in PowerClerk. Above 10 kW, GWP estimates your annual load as 110% of your last 12 months of usage and compares it with the system's estimated production. GWP no longer requires a separate meter for home energy storage.
GWP credits excess solar generation to your account and applies the credit automatically when it is needed. Questions go to GWPSolarSolutions@glendaleca.gov or 818-548-2750. A bid that does not mention the 10 kW line, the 30 kWh storage allowance or the meter reprogramming step was probably written for SCE territory.
What a Glendale quote needs to explain
| Check | Ask each bidder |
|---|---|
| GWP size rule | Say whether the system is 10 kW CEC-AC or less (self-certified) or larger and sized against 110% of your past-year usage. |
| Battery | State the usable storage and whether it stays within GWP's 30 kWh allowance for PV-paired storage on small systems. |
| Order of approvals | Show the GWP PowerClerk review, then the Glendale Permits submission, then inspection and GWP's meter reprogramming. |
| Interconnection agreement | Use GWP's current Interconnection Agreement dated January 1, 2026. |
Related Glendale project questions
Use these guides to prepare the specific questions a written bid needs to answer.
- Solar Optimum review — what the company sells and what to check before signing
A comparison to ask for
Two Glendale bids for a 12 kW system and a 9.5 kW system are not only different sizes: under GWP's rules the larger one must be justified against 110% of your last 12 months of usage, while a system of 10 kW or less is exempt from that cap and self-certified. Ask each bidder to show which rule its design falls under and the usage figures it used.
Verify the company behind the Glendale quote
Match the business name and license number on each Glendale proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison. What you pay the utility today is on the Glendale rates and bills page.
Permit fees and the filing route are on the Glendale solar cost and permit page.
Glendale solar quote questions
Who supplies electricity in Glendale?
Glendale Water & Power, the City's municipal utility, serves nearly all of Glendale on the Energy Commission's service-territory map. It sets its own rates and net energy metering rules.
How big can a solar system be on a GWP account?
Since November 1, 2023, residential systems up to 10 kW CEC-AC are exempt from GWP's 110% historical-usage cap and may add up to 30 kWh of PV-paired storage. For larger systems, GWP compares estimated production with 110% of your usage over the past 12 months.
How long does GWP take to turn on a solar system?
GWP says it reviews a residential application in 3 to 5 business days. After the City's inspection is approved, its field crews reprogram the meter for net metering in 7 to 10 working days, and then the system receives permission to operate.
Where can I read about Solar Optimum?
Solar Optimum is one of the companies Glendale homeowners search for. Our Solar Optimum review covers what it sells and what to check; this page does not rank or recommend installers.
Before you sign anything in Glendale
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.