California solar decisions
Solar Companies in San Marcos, CA: Who Installed the Most Systems in 2025
Utility records show 439 home solar systems connected in San Marcos in 2025. Sunrun Inc. was the installer of record on 140 of them, followed by Baker Electric, Inc. (43) and GAF Energy (32). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Homeowner expedited permit
- 1 to 3 business days
- Roof-mounted systems of 10 kW or less
- City of San Marcoschecked Sep 23, 2026
- Before inspection
- Permit Declaration Form
- Inspection cannot be scheduled without it
- City of San Marcoschecked Sep 23, 2026
- Supplies the generation
- Clean Energy Alliance
- Since April 2023; SDG&E delivers
- Clean Energy Alliancechecked Sep 23, 2026
Installers who connected the most home solar systems in San Marcos in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Sunrun Inc. | 140 | 332 | 750184 check |
| Baker Electric, Inc. | 43 | 87 | 858088 check |
| GAF Energy | 32 | 110 | 1062345 check |
| SunPower Corporation | 20 | 97 | 890895 check |
| Bright Planet Solar | 20 | 42 | 1020761 check |
| SolarCity | 13 | 33 | 888104 check |
| Freedom Solar Co | 12 | 25 | 1029644 check |
| Stellar Solar | 10 | 16 | 749095 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in San Marcos by the numbers
SDG&E approved 439 home solar systems in San Marcos in 2025, from 76 installers; the top three were named on 49% of them. The busiest year since 2021 was 2023, with 1,664 (2025: -74%). Another 243 were approved from January through May 2026.
2025 mix: 34% leased or on a power purchase agreement, 66% owned by the household; 0% with a battery; median size 5.4 kW DC. San Diego County: 36% leased or PPA, 0% with a battery, median 5.36 kW.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 877 | 1,162 | 1,664 | 511 | 439 |
Hiring a solar company in San Marcos
San Marcos gives solar two permit routes: contractors use SolarAPP+ plus a City business license and a Permit Declaration Form, and homeowners with a roof-mounted system of 10 kW or less can apply online on an expedited path the City estimates at one to three business days. Clean Energy Alliance supplies San Marcos generation and SDG&E delivers it. Get at least three written bids that name the route and model your own bill.
Start with your San Marcos electricity bill
San Marcos joined Clean Energy Alliance in April 2023, together with Escondido, and the Energy Commission's map places nearly the whole city inside CEA's area. On most San Marcos bills CEA supplies the generation and SDG&E delivers the power, adds its fixed Base Services Charge and sends the statement. Ask every bidder to start from that bill, not a generic SDG&E rate.
The contractor route and the homeowner route
The City of San Marcos lays out six steps for contractors: confirm the project is eligible, submit the design to SolarAPP+, pay SolarAPP+'s processing fee, obtain a City of San Marcos business license, log into the City's permitting system to submit the forms and pay the permit fees with the Permit Declaration Form attached, and schedule the inspection. The City is explicit that the inspection cannot be booked without a completed Permit Declaration Form.
Homeowners doing their own project have a separate path. A roof-mounted system that produces 10 kW or less can be submitted through the City's online portal under the Roof Mounted Solar PV Expedited option, with an estimated one to three business days of processing. The City also publishes an eligibility checklist, standard plans for string or central inverters and for microinverters, and a reroofing certification. Either way, panels cannot exceed the height limit set by the property's zoning.
What Clean Energy Alliance means for a San Marcos solar home
Clean Energy Alliance began serving San Marcos in April 2023. A home that already had solar kept its net energy metering version when it moved to CEA; a new system first enrolls in SDG&E's program and is then placed in CEA's solar program automatically. CEA calculates charges and credits monthly and closes each account's year on the anniversary of its net metering enrollment.
At that annual true-up, CEA zeroes out leftover credits, and a net energy metering account that produced more than it used is paid $0.06 per kWh of surplus, by check at $100 or more and otherwise as a credit toward the next year. The fixed SDG&E Base Services Charge stays on the delivery side whether or not you have solar. Ask each bidder how much of the system's output its model sends to the grid, and at what value.
What a San Marcos quote needs to explain
| Check | Ask each bidder |
|---|---|
| Permit route | Say whether the job goes through SolarAPP+ or the homeowner expedited route, and who files it. |
| City paperwork | Confirm a current City of San Marcos business license and who completes the Permit Declaration Form. |
| Zoning height | Confirm the panels stay within the height limit set by the property's zoning. |
| CEA and SDG&E bill | Model Clean Energy Alliance generation and SDG&E delivery from your own bill, including the Base Services Charge. |
A comparison to ask for
Before you compare two San Marcos bids on price, ask each one which route it is using. A contractor bid should name its SolarAPP+ application, its City business license and who signs the Permit Declaration Form. If you are thinking of doing part of the work yourself, the homeowner route is limited to roof-mounted systems of 10 kW or less.
Verify the company behind the San Marcos quote
Match the business name and license number on each San Marcos proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.
Permit fees and the filing route are on the San Marcos solar cost and permit page.
San Marcos solar quote questions
How do I get a solar permit in San Marcos, CA?
A contractor applies through SolarAPP+, pays its processing fee, gets a City of San Marcos business license and files the City forms, including the Permit Declaration Form, in the City's permitting system. A homeowner with a roof-mounted system of 10 kW or less can use the Roof Mounted Solar PV Expedited option instead.
How long does a San Marcos solar permit take?
For the homeowner expedited route, the City estimates one to three business days. It does not publish a time for SolarAPP+ applications on the same page.
Who supplies electricity in San Marcos?
Clean Energy Alliance has supplied generation in San Marcos since April 2023. SDG&E delivers the power and sends the bill.
Before you sign anything in San Marcos
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.