Independent information and referral site. Not a utility, contractor or government agency. Figures link to their sources. How we make money
California solar decisions
Solar Companies in Tracy, CA: Who Installed the Most Systems in 2025
Utility records show 777 home solar systems connected in Tracy in 2025. Sunrun was the installer of record on 165 of them, followed by Tesla Energy Operations Inc (77) and G A F Energy LLC (65). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Ava evening bonus
- $0.025 per kWh
- Exports 3-8 p.m., non-CARE/FERA customers
- Ava Community Energychecked Sep 23, 2026
- 2024 solar permits
- 569
- 86% with storage, none issued online
- California Energy Commission (SB 379 reports)checked Sep 23, 2026
Installers who connected the most home solar systems in Tracy in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Sunrun | 165 | 335 | 750184 check |
| Tesla Energy Operations Inc | 77 | 157 | 888104 check |
| G A F Energy LLC | 65 | 146 | 1062345 check |
| Complete Solar Inc | 54 | 57 | 961988 check |
| Integrated Energy Group LLC | 52 | 52 | 1112430 check |
| Sonray Construction | 40 | 40 | 922628 check |
| Bright Ops | 30 | 88 | 1020761 check |
| Citadel Roofing and Solar | 22 | 27 | 647149 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in Tracy by the numbers
PG&E approved 777 home solar systems in Tracy in 2025, from 83 installers; the top three were named on 40% of them. The busiest year since 2021 was 2022, with 1,669 (2025: -53%). Another 287 were approved from January through May 2026.
2025 mix: 46% leased or on a power purchase agreement, 54% owned by the household; 39% with a battery; median size 5.26 kW DC. San Joaquin County: 52% leased or PPA, 40% with a battery, median 5.64 kW.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 1,370 | 1,669 | 1,416 | 791 | 777 |
Hiring a solar company in Tracy
Solar companies in Tracy submit photovoltaic permit applications to the City's Building Safety Division, which takes them at photovoltaic@cityoftracy.org, and connect the system to PG&E. Ava Community Energy supplies the generation and adds its own export bonus for power sent to the grid between 3 and 8 p.m. Compare at least three written bids built on your own Ava and PG&E bill.
Start with your Tracy electricity bill
Tracy is one of the San Joaquin County cities Ava Community Energy serves, so a Tracy bill carries PG&E delivery charges and Ava generation charges. For systems on the Solar Billing Plan, Ava follows PG&E's policy closely but adds its own export bonus, trues up generation every April and pays balances over $100, while PG&E trues up delivery on its own schedule. Have each bidder model both halves.
How Ava credits a Tracy solar home
Ava Community Energy is the default generation provider in most of Alameda and San Joaquin counties, and its list of communities names Tracy along with Lathrop, Stockton and unincorporated San Joaquin County. A Tracy customer whose system connected after April 14, 2023 is on the Solar Billing Plan: imports and exports are calculated separately each month, exports earn hourly export credits, and credits left after a month's charges roll forward.
Ava adds two bonuses PG&E does not: an extra $0.01 per kWh on all exports for CARE and FERA customers, and an extra $0.025 per kWh on exports between 3 and 8 p.m. for everyone else. Ava trues up generation every April and pays surplus above $100 through its vendor, typically in June or July; smaller balances roll over as credit. PG&E's delivery true-up can fall in a different month, so a bid should show the two separately.
Tracy's permits, and a year that changed
Tracy's Building Safety Division takes photovoltaic submittals at photovoltaic@cityoftracy.org. The City charges the plan check fee before plans are reviewed and the rest of the permit fees at issuance. Tracy reported a custom automated platform to the Energy Commission rather than SolarAPP+ or Symbium.
Its SB 379 reports show a sharp shift. In 2023 the City reported 160 residential solar permits, about 83% issued online and 12% with storage. In 2024 it reported 569, none issued online and about 86% with storage. More projects, most of them with batteries, and all of them reviewed by staff: ask each bidder how long its recent Tracy permits took, and whether your design needs anything beyond a standard review.
What a Tracy quote needs to explain
| Check | Ask each bidder |
|---|---|
| Submittal | Say how the permit will be filed with Tracy Building Safety and who answers plan check comments. |
| Ava bonus | Show how much export falls between 3 and 8 p.m., where Ava adds $0.025 per kWh. |
| Two true-ups | Model Ava's April generation true-up and PG&E's delivery true-up separately. |
| Battery | Price the battery as its own line, with usable kWh and discharge settings. |
Related Tracy project questions
Use these guides to prepare the specific questions a written bid needs to answer.
A comparison to ask for
Ava pays an extra $0.025 per kWh for exports between 3 and 8 p.m. to customers who are not on CARE or FERA. A west-facing array or a battery set to discharge into the evening can earn more of that bonus, so ask each bidder how its design and battery settings treat those hours, and to show the Ava and PG&E portions of the bill separately.
Verify the company behind the Tracy quote
Match the business name and license number on each Tracy proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.
Permit fees and the filing route are on the Tracy solar cost and permit page.
Tracy solar quote questions
What are the best solar companies in Tracy, CA?
This site does not rank them. Shortlist companies with a CSLB license covering solar that have filed Tracy permits and confirm your address in writing, then compare at least three written bids for the same system, each built on your Ava and PG&E bill.
Who supplies electricity in Tracy?
PG&E delivers it and sends the bill, and Ava Community Energy, which names Tracy among the San Joaquin County communities it serves, supplies the generation by default. The Energy Commission's utility map shows Ava over almost all of the city.
What does Ava pay for extra solar?
On the Solar Billing Plan, Ava credits exports at the hourly export value, adds $0.025 per kWh for exports between 3 and 8 p.m. for customers not on CARE or FERA and $0.01 per kWh for CARE and FERA customers, and trues up every April. Balances under $100 roll over as bill credit; larger balances are paid, typically in June or July.
How many solar permits does Tracy issue?
Tracy reported 160 residential solar permits to the California Energy Commission for 2023 and 569 for 2024. About 86% of the 2024 permits included battery storage, and none of them was issued online, compared with about 83% online in 2023.
Before you sign anything in Tracy
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.