Independent information and referral site. Not a utility, contractor or government agency. Figures link to their sources. How we make money
California solar decisions
Solar Companies in Aliso Viejo, CA: Who Installed the Most Systems in 2025
Utility records show 110 home solar systems connected in Aliso Viejo in 2025. Sunrun was the installer of record on 40 of them, followed by Freedom Forever (17) and Tesla Energy Operations Inc (12). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Utility split
- SCE about 58%, SDG&E about 42%
- By area on the CEC map; check your bill
- California Energy Commissionchecked Sep 23, 2026
- Instant permit
- SolarAPP+
- With or without storage; service upgrade can be added
- City of Aliso Viejochecked Sep 23, 2026
- Garage battery
- OCFA-approved plan
- Required at the time of inspection
- City of Aliso Viejochecked Sep 23, 2026
Installers who connected the most home solar systems in Aliso Viejo in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Sunrun | 40 | 85 | 750184 check |
| Freedom Forever | 17 | 29 | 1124448 check |
| Tesla Energy Operations Inc | 12 | 31 | 888104 check |
| Freedom Forever Southern California LLC | 6 | 7 | 1124448 check |
| Orange County Contracting Services | 4 | 11 | 1023627 check |
| Semper Solaris | 3 | 4 | 978152 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in Aliso Viejo by the numbers
SCE approved 110 home solar systems in Aliso Viejo in 2025, from 32 installers; the top three were named on 63% of them. The busiest year since 2021 was 2023, with 258 (2025: -57%). Another 41 were approved from January through May 2026.
2025 mix: 60% leased or on a power purchase agreement, 40% owned by the household; 92% with a battery; median size 7.26 kW DC. Orange County: 40% leased or PPA, 65% with a battery, median 6.75 kW.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 110 | 204 | 258 | 99 | 110 |
Hiring a solar company in Aliso Viejo
Solar companies in Aliso Viejo first need to know whether your home is on SCE or SDG&E: the city is split between the two, with SDG&E covering about two-fifths of its area on the Energy Commission's map. Permits come through the City's Instant Solar Permit via SolarAPP+, and a battery in a garage needs an Orange County Fire Authority approved plan at inspection. Compare at least three written bids built on your own bill.
Start with your Aliso Viejo electricity bill
On the California Energy Commission's service-territory map, about 58% of Aliso Viejo's area is SCE territory and about 42% is SDG&E's, and no community choice provider serves either part. The two utilities run different Solar Billing Plan rate plans and export values, so the utility named on your bill decides which one a proposal has to model. A bid copied from a neighbor across the line may use the wrong utility.
Two utilities in one city
Aliso Viejo sits on the boundary between Southern California Edison and San Diego Gas & Electric. The Energy Commission's service-territory map puts about 58% of the city's area in SCE territory and about 42% in SDG&E's, and shows no community choice provider over either. Both utilities put new solar customers on a Solar Billing Plan, but each has its own rate plan and export values: SDG&E uses EV-TOU-5 with on-peak from 4 to 9 p.m., and SCE's rates are often higher on summer weekdays in the same hours.
SCE adds a credit of about $0.04 per kWh for eligible customers who enroll before 2028 and trues up in the month the system started service. SDG&E lets a Solar Billing Plan customer oversize by up to 50% only with an attestation of higher expected use. A bid that does not name your utility and its rate plan is not built for your home.
Aliso Viejo's Instant Solar Permit
The City's Instant Solar Permit is available only to contractors registered with SolarAPP+ and covers roof-mounted photovoltaic panels with or without an energy storage system; a main electrical service upgrade can be added. The contractor submits the project in SolarAPP+, pays the $25 processing fee and downloads the approval documents, then applies in the City's online permitting portal and pays the permit fees online or in person at City Hall. Inspections are requested through the portal and scheduled for the next business day unless otherwise specified.
One local rule stands out: any energy storage system inside a garage requires an Orange County Fire Authority approved plan at the time of inspection. The City's reports to the Energy Commission show every one of its 269 permits in 2023 and 157 in 2025 issued online, with none reported as including storage.
What an Aliso Viejo quote needs to explain
| Check | Ask each bidder |
|---|---|
| SCE or SDG&E | Name the utility from your bill and model its Solar Billing Plan and rate plan. |
| Garage battery | Provide an OCFA-approved plan at inspection for a battery inside the garage. |
| Instant permit | Confirm registration with SolarAPP+ and whether a service upgrade is included. |
| Inspection | Say who requests the inspection, normally scheduled for the next business day. |
Related Aliso Viejo project questions
Use these guides to prepare the specific questions a written bid needs to answer.
A comparison to ask for
Before comparing prices, ask each bidder which utility it modeled and to show that utility's rate plan by name. An SDG&E home is on EV-TOU-5 under the Solar Billing Plan; an SCE home is on SCE's own time-of-use plan. If a battery is going in the garage, ask who obtains the OCFA-approved plan.
Verify the company behind the Aliso Viejo quote
Match the business name and license number on each Aliso Viejo proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.
Aliso Viejo solar quote questions
What are the best solar companies in Aliso Viejo?
This site does not rank them. Shortlist companies with a CSLB license covering solar that are registered with SolarAPP+, can tell you whether your address is SCE or SDG&E, and confirm it in writing. Then compare at least three written bids for the same system.
Is Aliso Viejo served by SCE or SDG&E?
Both, by address. On the Energy Commission's service-territory map about 58% of the city's area is SCE and about 42% SDG&E, with no community choice provider. Read the utility name on your bill.
Does a battery in the garage need extra approval in Aliso Viejo?
Yes. The City says any energy storage system installed inside a garage requires an Orange County Fire Authority approved plan at the time of inspection.
How many solar permits does Aliso Viejo issue?
Aliso Viejo reported 269 residential solar permits to the California Energy Commission for 2023 and 157 for 2025, all issued online, and reported none with battery storage in either year.
Before you sign anything in Aliso Viejo
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.