    Solar Companies in Irvine, CA: Who Installed the Most Systems in 2025

    Utility records show 1,393 home solar systems connected in Irvine in 2025. Solara Home Energy LLC was the installer of record on 265 of them, followed by Sunnova Energy Corporation (261) and Sunrun (217). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.

    California Rate Relief is a private solar referral service.

    Key facts

    Delivers the power
    SCE
    Delivery charges and credits, meter and statement
    Orange County Power Authoritychecked Sep 23, 2026
    Supplies the generation
    Orange County Power Authority
    Treats new solar customers' generation as if on NEM 2.0
    Orange County Power Authoritychecked Sep 23, 2026
    Same-day permit limit
    38.4 kW and one battery
    PermitsDIRECT!, licensed contractors only
    City of Irvinechecked Sep 23, 2026

    Installers who connected the most home solar systems in Irvine in 2025

    Home solar systems per installer in Irvine, from utility interconnection records
    Installer (name as reported)Systems in 2025Jan 2024 to May 2026CSLB license
    Solara Home Energy LLC2653711103958 check
    Sunnova Energy Corporation2615681003498 check
    Sunrun217439750184 check
    Tesla Energy Operations Inc123279888104 check
    G A F Energy LLC1062741062345 check
    Aikyum Solar69149986427 check
    Complete Solar Inc4647961988 check
    Orange County Contracting Services45931023627 check

    Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).

    Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).

    Start with your bill

    Or tap a typical amount

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Home solar in Irvine by the numbers

    SCE approved 1,393 home solar systems in Irvine in 2025, from 98 installers; the top three were named on 53% of them. The busiest year since 2021 was 2023, with 2,685 (2025: -48%). Another 584 were approved from January through May 2026.

    2025 mix: 34% leased or on a power purchase agreement, 66% owned by the household; 65% with a battery; median size 4.51 kW DC. Orange County: 40% leased or PPA, 65% with a battery, median 6.75 kW.

    Home solar systems connected per year in Irvine, 2021 to 2025
    Year20212022202320242025
    Systems connected1,2062,0882,6851,2741,393

    Hiring a solar company in Irvine

    Irvine runs its own program for choosing a solar company: Solarize Irvine, a partnership with the nonprofit OC Goes Solar, uses a community evaluation panel to vet and select contractors and negotiates group pricing. Whatever route you take, your panels will be permitted through the City's same-day PermitsDIRECT! system, and Orange County Power Authority (not SCE) sets how your exported generation is paid.

    Start with your Irvine electricity bill

    Check the generation provider and rate plan on the current SCE bill. Orange County Power Authority can provide generation while SCE delivers electricity and handles billing. Solar charges and credits belong to both sides, so a proposal should not model an SCE-only generation account unless that is what the bill shows.

    Solarize Irvine: the City's own contractor screen

    The City of Irvine and the nonprofit OC Goes Solar run Solarize Irvine, which gives residents access to group pricing for solar and battery storage. The program recruits residents for a community contractor evaluation panel that vets and selects the participating contractors, and its workshops walk through a pre-negotiated pricing structure for the program-selected systems. The City scheduled its Solarize Irvine 2026 launch event for June 17 at the Las Lomas Community Center.

    A Solarize price is still a quote to check, not a verdict. Put it next to at least two bids from companies outside the program, built on the same roof layout, the same OCPA and SCE bill and the same battery size, and compare the total price, the equipment and the warranty terms line by line. If the program-selected price wins on those terms, you have confirmed it; if not, you have learned something before signing.

    Irvine's two permit routes

    Since April 2024 Irvine has issued permits for eligible single-family solar and battery systems through PermitsDIRECT!, a web platform powered by Symbium that checks code compliance and the contractor and business licenses in real time. Fees are paid online and the permit is issued automatically, the same day, without manual review. To qualify, the job must be a rooftop system of no more than 38.4 kW, include no more than one battery storage system, and be submitted by a licensed contractor.

    Anything larger goes through the standard route: plans uploaded to the IrvineReady! online portal, a completeness check the City says takes about two business days, an emailed fee link, then roughly five working days for the first plan check. The standard application must state the system's kW (DC) and panel count, flag any main panel upgrade or battery backup, and include load calculations if the main breaker is de-rated. Irvine also reminds homeowners that their HOA may run its own approval process.

    How OCPA pays an Irvine solar home

    Orange County Power Authority supplies generation for Irvine, with SCE delivering the power; SCE handles the delivery side of the solar charges and credits, and OCPA handles the generation side. OCPA says it currently treats solar customers on the Net Billing Tariff as if their generation were under NEM 2.0, reconciles generation charges monthly, runs an April annual true-up so credits banked in sunny months carry into winter, and pays 10% more than SCE for excess generation at true-up.

    That makes an Irvine proposal different from one written for an SCE-only city nearby. Ask the bidder whether its savings figure uses OCPA's treatment of the generation side, and to show the SCE delivery charges you will still pay. OCPA's residential plans are Basic Choice, Smart Choice and 100% Renewable Choice; the plan on your bill changes the generation price the model should use.

    What an Irvine quote needs to explain

    Local project questions for Irvine
    CheckAsk each bidder
    OCPA and SCE billModel OCPA's generation treatment and plan (Basic, Smart or 100% Renewable Choice) and SCE's delivery rate from your actual bill.
    Permit routeSay whether the job fits PermitsDIRECT! (up to 38.4 kW, one battery) or needs IrvineReady! plan review, and who handles corrections.
    Solarize comparisonIf you also get a Solarize Irvine price, compare it on the same design, equipment and warranty as the outside bids.
    HOA and contractor scopeKeep HOA review, City permit duties, roof work and the licensed contractor's obligations separate and written.

    Related Irvine project questions

    Use these guides to prepare the specific questions a written bid needs to answer.

    A comparison to ask for

    Give every bidder the same SCE/OCPA bill history and roof layout. Compare monthly production, total contract price, financing, roof and panel work, storage, permit duties and remaining generation and delivery charges. A battery changes both scope and permit route.

    Verify the company behind the Irvine quote

    Match the business name and license number on each Irvine proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison. What you pay the utility today is on the Irvine rates and bills page.

    Permit fees and the filing route are on the Irvine solar cost and permit page.

    Irvine solar quote questions

    Does OCPA replace SCE for an Irvine account?

    No. OCPA supplies the generation and handles the generation side of solar charges and credits; SCE delivers the power and handles the delivery side. Both appear on the SCE bill.

    Can an Irvine solar permit include a battery?

    Yes. The City's same-day PermitsDIRECT! route covers rooftop systems up to 38.4 kW with no more than one battery storage system, submitted by a licensed contractor. More than one battery, or a larger system, goes through the standard IrvineReady! plan review.

    What is Solarize Irvine?

    A City of Irvine program run with the nonprofit OC Goes Solar that offers group pricing on solar and battery storage through contractors selected by a community evaluation panel. It is one option to compare, alongside bids from companies outside the program.

    Before you sign anything in Irvine

    Two of the contract terms that most often change what a quote really costs.

    Ask for a competing quote

    Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.

    Step 1 of 2 — your bill

    No contact details on this step. Nothing is sent until you submit the second step.

    Submitting does not guarantee a quote, savings, program funding or eligibility.

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Before you send anything

    What this is
    California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
    What happens after the form
    Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
    How you are contacted
    Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
    Using the site without submitting
    The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.