Independent information and referral site. Not a utility, contractor or government agency. Figures link to their sources. How we make money
California solar decisions
Solar Companies in Camarillo, CA: Who Installed the Most Systems in 2025
Utility records show 403 home solar systems connected in Camarillo in 2025. Sunrun was the installer of record on 117 of them, followed by Solara Home Energy LLC (39) and Quantum Solar Designs Inc (28). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Expedited review limit
- 10 kW AC, no battery
- Roof-mounted, 225 A bus or less, two central inverters max
- City of Camarillochecked Sep 23, 2026
- Supplies the generation
- Clean Power Alliance
- Camarillo default: 100% Green, serving since 2019
- Clean Power Alliancechecked Sep 23, 2026
- CPA surplus rate
- 10% above SCE's
- April true-up for Solar Billing Plan customers
- Clean Power Alliancechecked Sep 23, 2026
Installers who connected the most home solar systems in Camarillo in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Sunrun | 117 | 216 | 750184 check |
| Solara Home Energy LLC | 39 | 60 | 1103958 check |
| Quantum Solar Designs Inc | 28 | 49 | 956241 check |
| Tesla Energy Operations Inc | 26 | 61 | 888104 check |
| Porticade Energy LLC | 21 | 28 | 1089987 check |
| G A F Energy LLC | 21 | 51 | 1062345 check |
| Sunnova Energy Corporation | 20 | 21 | 1003498 check |
| PES Energy | 10 | 13 | 1122420 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in Camarillo by the numbers
SCE approved 403 home solar systems in Camarillo in 2025, from 70 installers; the top three were named on 46% of them. The busiest year since 2021 was 2023, with 637 (2025: -37%). Another 205 were approved from January through May 2026.
2025 mix: 42% leased or on a power purchase agreement, 58% owned by the household; 86% with a battery; median size 6.15 kW DC. Ventura County: 44% leased or PPA, 89% with a battery, median 6.8 kW.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 384 | 636 | 637 | 256 | 403 |
Hiring a solar company in Camarillo
Camarillo's expedited solar review is narrow: it covers roof-mounted systems of 10 kW AC or less, on a home or accessory structure, with no battery and a service panel bus rated 225 amps or less. A solar installation company that adds a battery or a larger array will be on the standard review. Clean Power Alliance supplies Camarillo's generation at its 100% Green default, with SCE delivering. Compare three written bids on those terms.
Start with your Camarillo electricity bill
If your SCE bill includes Clean Power Alliance generation, compare both portions. CPA’s solar guidance describes circumstances where generation and delivery enrollment can differ for an existing system. Have the bidder check the account and interconnection history instead of assuming one label applies to everything.
What Camarillo's expedited checklist allows
Camarillo's solar eligibility checklist sets the line between a fast review and a standard one. To qualify, the system must be 10 kW AC (CEC rating) or less, utility-interactive with no battery storage, roof-mounted on a one- or two-family dwelling or accessory structure, and no taller than the legal building height. Electrically, it must tie into a single-phase service panel with a bus bar rated 225 amps or less, use no more than two central inverters, and keep to four strings per MPPT input where the inverter has source-circuit fusing (two where it does not). The plans must show clear fire access pathways, the fire classification of the system and all required labels.
Any item answered no means a design revision or the standard, non-expedited review. That makes the checklist a practical way to compare two Camarillo bids: if one design stays inside it and another adds a battery or a larger inverter setup, the second will take longer to permit, and that time belongs in the schedule you are promised.
Clean Power Alliance on a Camarillo solar bill
Camarillo has been a Clean Power Alliance community since 2019, with 100% Green as its default option. CPA applies generation charges and credits on its side of the SCE bill and SCE handles the delivery side. Systems SCE approved on or before August 31, 2023 stay on net energy metering; later ones are on the Solar Billing Plan, which CPA trues up every April.
At true-up CPA pays surplus at rates it describes as 10% higher than SCE's, mailing a check for credits over $100. Existing-system owners replacing a roof should keep that enrollment in mind: ask any bidder who proposes new equipment whether the change affects the system's current billing plan before you sign.
What a Camarillo quote needs to explain
| Check | Ask each bidder |
|---|---|
| Existing solar history | Record the original interconnection documents and confirm CPA generation versus SCE delivery enrollment. |
| Roof work or new system | Separate panel removal/reset, roof repair, new equipment and utility reconnection responsibilities. |
| Permit record | Confirm OpenGov for new work or the appropriate older active permit process before relying on a completion date. |
A comparison to ask for
For a house with existing solar and a roof replacement ahead, request a removal/reinstallation quote alongside a replacement-system quote. Both should name the roof contractor, wiring work and reconnection steps. Then compare whether the proposed equipment change affects the CPA and SCE billing arrangements already in place.
Verify the company behind the Camarillo quote
Match the business name and license number on each Camarillo proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.
Permit fees and the filing route are on the Camarillo solar cost and permit page.
Camarillo solar quote questions
Can a Camarillo solar project with a battery use the expedited permit?
No. The City's solar eligibility checklist limits expedited review to utility-interactive systems without battery storage, 10 kW AC or smaller, roof-mounted on a home or accessory structure. A battery project goes through standard review.
Who supplies electricity in Camarillo?
SCE delivers the power and sends the bill; Clean Power Alliance supplies the generation, with 100% Green as Camarillo's default option.
Can CPA and SCE treat an existing Camarillo system differently?
CPA’s solar guidance describes an enrollment window with CPA NEM generation and SCE Solar Billing Plan delivery. Ask both providers to confirm your account before changing the system.
Does a roof replacement quote include moving my solar panels?
Only if the written scope says so. Name the businesses responsible for removal, roof work, reinstallation and reconnection, and request the warranty responsibilities in writing.
Before you sign anything in Camarillo
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.