Independent information and referral site. Not a utility, contractor or government agency. Figures link to their sources. How we make money
California solar decisions
Solar Companies in Concord, CA: Who Installed the Most Systems in 2025
Utility records show 557 home solar systems connected in Concord in 2025. Sunrun was the installer of record on 132 of them, followed by Bright Ops (59) and Tesla Energy Operations Inc (45). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Delivers the power
- PG&E
- Delivery charges and the monthly statement
- California Energy Commissionchecked Sep 23, 2026
- MCE surplus payment
- NSC rate + $0.02/kWh
- Up to $5,000 a year; checks above $200
- MCEchecked Sep 23, 2026
Installers who connected the most home solar systems in Concord in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Sunrun | 132 | 277 | 750184 check |
| Bright Ops | 59 | 102 | 1020761 check |
| Tesla Energy Operations Inc | 45 | 75 | 888104 check |
| V3 Electric Inc | 38 | 70 | 1000573 check |
| Got Watts Electric, Solar & HVAC | 36 | 61 | 985920 check |
| Freedom Forever | 22 | 44 | 1029644 check |
| North Valley LLC | 11 | 18 | 1080746 check |
| Axia Solar Corp | 10 | 17 | 1090641 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in Concord by the numbers
PG&E approved 557 home solar systems in Concord in 2025, from 86 installers; the top three were named on 42% of them. The busiest year since 2021 was 2022, with 936 (2025: -40%). Another 177 were approved from January through May 2026.
2025 mix: 48% leased or on a power purchase agreement, 52% owned by the household; 60% with a battery; median size 6.58 kW DC. Contra Costa County: 43% leased or PPA, 58% with a battery, median 6.48 kW.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 589 | 936 | 857 | 450 | 557 |
Hiring a solar company in Concord
A solar company installing in Concord, California files the permit through the City's Virtual Permit Center, using SolarAPP+, one of four City standardized configurations, or full drawings, and connects the system to PG&E. MCE supplies generation for Concord and pays extra for year-end surplus, so its rules belong in every savings estimate. Compare at least three written bids built on your own MCE and PG&E bill.
Start with your Concord electricity bill
Concord homes get delivery from PG&E and, by default, generation from MCE, the community choice provider that lists Concord among its 16 Contra Costa member communities. PG&E charges for delivery and MCE's generation charges are settled on the same monthly statement. A solar proposal for a Concord home should model both companies, and your own enrollment, not a PG&E-only account.
How MCE treats a Concord solar home
MCE splits its solar customers by application date. Systems whose applications were filed before April 14, 2023 stay on net energy metering; applications after that date, and older NEM 1 systems whose 20-year legacy period has run out, are on the Solar Billing Plan. PG&E keeps charging for all delivery, and MCE's generation charges are settled on the monthly bill.
The difference from a PG&E-only account shows up at year end. MCE's annual cash-out cycle runs April through March, and it pays surplus at the Net Surplus Compensation rate plus $0.02 per kWh, up to $5,000 a year. Customers who choose MCE's Deep Green 100% renewable option earn another $0.01 per kWh in credits for excess energy. Amounts of $200 or less land as a bill credit; larger ones are paid by check.
A system sized to your own usage should not leave a large yearly surplus, so treat that payment as a detail to check rather than a reason to oversize. What matters more is that each bidder models your MCE plan and PG&E delivery charges correctly.
Concord's three permit routes
Concord's Building Division gives contractors three ways to submit a home solar permit. SolarAPP+ checks a standard rooftop design automatically and issues a pre-approval that goes into the City's application. The City's four standardized configurations let a contractor fill out a pre-drawn plan set instead of producing custom drawings. Anything else needs a complete set of professional drawings. All three are filed through the Virtual Permit Center.
The route changes how fast a permit comes back and how much drafting the contractor has to do, which can show up in the price. Ask each bidder which route its design uses, and if it needs custom drawings, why a standard route does not fit your roof.
What a Concord quote needs to explain
| Check | Ask each bidder |
|---|---|
| MCE and PG&E bill | Model MCE generation and PG&E delivery from your actual statement, including your MCE plan. |
| Permit route | Say whether the job uses SolarAPP+, a standardized configuration or custom drawings, filed in the Virtual Permit Center. |
| Surplus assumption | If the design produces more than you use in a year, show what MCE pays for the surplus and when. |
| Contractor record | Name the licensed contracting business, its CSLB number and who handles service after installation. |
A comparison to ask for
Two Concord bids can show different savings for the same array because one counts MCE's surplus payment and one does not. Ask both to model your MCE and PG&E account on the Solar Billing Plan, show what a year-end surplus would be worth under MCE's rules, and price any battery on its own line.
Verify the company behind the Concord quote
Match the business name and license number on each Concord proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.
Permit fees and the filing route are on the Concord solar cost and permit page.
Concord solar quote questions
Is Concord served by MCE?
Yes. MCE lists Concord among its Contra Costa County member communities, and the Energy Commission's map places the city in both PG&E's delivery area and MCE's service area. Check your bill for your enrollment.
What does MCE pay for extra solar power?
MCE says it pays surplus from its annual cycle at the Net Surplus Compensation rate plus $0.02 per kWh, up to $5,000, and adds $0.01 per kWh in credits for customers on its Deep Green 100% renewable option. Payments of $200 or less are applied as a bill credit; larger amounts are paid by check.
How do I find a solar company in Concord, CA?
Check each company's CSLB license, confirm it will file through Concord's Virtual Permit Center, and compare at least three written bids built on your own MCE and PG&E bill. This page does not rank installers.
Before you sign anything in Concord
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.