    Solar Companies in Modesto, CA: Installer Counts and License Checks

    Modesto's main electric utility, the Modesto and Turlock irrigation districts, is not in the state's solar interconnection data, which covers PG&E, SCE and SDG&E customers only, and lists one system at Modesto addresses in 2025. The table below covers Stanislaus County instead: 519 systems in 2025, led by Sunrun (190), Sig Solar, S.i.g. (74) and Bright Ops (40). It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.

    California Rate Relief is a private solar referral service.

    Key facts

    Electric utility
    MID or TID
    CEC map: about 78% of city land MID, 22% TID
    California Energy Commissionchecked Sep 23, 2026
    MID size cap
    115% of demonstrated load
    Anticipated load is not counted
    Modesto Irrigation Districtchecked Sep 23, 2026
    City expedited permit
    10 kW AC, no battery
    Filed in eTRAKiT; batteries take the standard route
    City of Modestochecked Sep 23, 2026

    Installers who connected the most home solar systems in Stanislaus County in 2025

    Home solar systems per installer in Stanislaus County, from utility interconnection records
    Installer (name as reported)Systems in 2025Jan 2024 to May 2026CSLB license
    Sunrun190388750184 check
    Sig Solar, S.i.g.74164997639 check
    Bright Ops40651020761 check
    Citadel Roofing and Solar3782647149 check
    Power Up Solutions LLC18241113778 check
    Tesla Energy Operations Inc1621888104 check
    Better Earth Electric Inc10191024460 check
    Allen Electric Inc945917826 check

    Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026). The data set covers PG&E, SCE and SDG&E customers only, so in Stanislaus County it counts the areas PG&E serves.

    Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).

    Start with your bill

    Or tap a typical amount

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Home solar in Stanislaus County by the numbers

    PG&E approved 519 home solar systems in Stanislaus County in 2025, from 61 installers; the top three were named on 59% of them. The busiest year since 2021 was 2023, with 697 (2025: -26%). Another 167 were approved from January through May 2026.

    2025 mix: 48% leased or on a power purchase agreement, 52% owned by the household; 49% with a battery; median size 6.8 kW DC.

    Home solar systems connected per year in Stanislaus County, 2021 to 2025
    Year20212022202320242025
    Systems connected508667697584519

    Hiring a solar company in Modesto

    Solar companies in Modesto answer to the electric district that serves the meter, not to PG&E. Most of the city is Modesto Irrigation District territory, where MID must approve the design before installation and caps system size at 115% of your demonstrated load; part of the city is Turlock Irrigation District territory, with its own rules. Get three written bids that name your district, then compare them on the checks below.

    MID's steps come before the panels go up

    MID lays out the order itself. The contractor submits a completed interconnection package to MID, in hard copy, and MID approves it or asks for corrections. Only then does the contractor pull the city or county permit and install. The contractor sends MID the final permit, MID performs its own inspection, and if that is clear MID installs the solar meter; after that the contractor can switch the system on. MID says an interconnection not completed within a year of its acknowledgment is cancelled, with one six-month extension available on request.

    MID offers NEM 2.0 today and does not offer solar rebates. Its sizing rule is the one most likely to separate two Modesto quotes: a system may not exceed 115% of the meter's annual demonstrated load, anticipated load is not considered, and oversized applications are mailed back to the contractor. MID's solar line is (209) 526-7582. A bidder that sized your system for an EV you have not bought yet should show you how the design fits that cap.

    If your meter is on TID

    The Energy Commission's map places roughly a fifth of Modesto's land area in Turlock Irrigation District territory. TID tells customers that installing solar moves them to a self-generation rate schedule, and that each of those schedules carries customer, demand and time-of-use energy charges, with a monthly TID bill continuing after the system is on. TID asks its customers to call (209) 883-8254 or email solar@tid.org to go over those charges before signing a contract.

    A proposal written for an MID or PG&E account will not model a demand charge, so if your bill comes from TID, ask each bidder to rebuild its savings figure on TID's self-generation rate.

    Modesto's expedited permit has limits

    The City of Modesto's expedited solar checklist, filed through eTRAKiT, applies to roof-mounted systems of 10 kW AC or less on one- or two-family homes that are utility-interactive and have no battery storage. The roof needs a single covering with no reroof overlay, the array may cover no more than half of the total roof area, and the plans must show three-foot fire access pathways and panels at least 18 inches from any hip or valley. If a home has a pool or other large load and a main service under 200 amps, the City requires electrical load calculations, and smoke and carbon monoxide alarms must be verified during the job.

    Any system with a battery, or any item on the checklist answered no, goes through the City's standard permit review instead. Ask each bidder which route its design uses; a battery quote that assumes expedited timing is assuming something the checklist rules out.

    What a Modesto quote needs to explain

    Local project questions for Modesto
    CheckAsk each bidder
    Correct electric districtUse the utility on the meter’s bill. Select Other / not sure in the inquiry if it is MID.
    Demonstrated usageAsk the bidder to show the load evidence used for MID sizing; separate any future-load assumption.
    Installation and activationItemize city/county permits, MID application, metering and utility inspection in the scope.

    A comparison to ask for

    A bidder may add panels for an electric vehicle you intend to buy. For an MID meter, ask whether that design meets MID’s demonstrated-load rule before comparing the larger system’s price. Have the quote identify metering equipment and utility inspection work. Approval comes before installation.

    Verify the company behind the Modesto quote

    Match the business name and license number on each Modesto proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison. What you pay the utility today is on the Modesto rates and bills page.

    Permit fees and the filing route are on the Modesto solar cost and permit page.

    Modesto solar quote questions

    Does MID offer solar rebates?

    No. MID's solar program page says it does not offer solar rebates. It currently offers only NEM 2.0 for new solar interconnections.

    Can I get Modesto's expedited solar permit with a battery?

    Not under the City's expedited checklist, which is limited to utility-interactive systems of 10 kW AC or less without battery storage. A solar-plus-battery project goes through the standard permit review.

    Should an MID quote use statewide NEM assumptions?

    No. MID publishes its own solar program, sizing rules and interconnection process. Have each bidder name the applicable MID schedule.

    Can a larger MID system be justified by an electric vehicle I may buy?

    MID’s current instructions say anticipated load is not considered. Ask MID and the bidder to confirm the allowed design from your demonstrated usage before committing.

    Before you sign anything in Modesto

    Two of the contract terms that most often change what a quote really costs.

    Ask for a competing quote

    Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.

    Step 1 of 2 — your bill

    No contact details on this step. Nothing is sent until you submit the second step.

    Submitting does not guarantee a quote, savings, program funding or eligibility.

    California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money

    Before you send anything

    What this is
    California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
    What happens after the form
    Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
    How you are contacted
    Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
    Using the site without submitting
    The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.