Independent information and referral site. Not a utility, contractor or government agency. Figures link to their sources. How we make money
California solar decisions
Solar Companies in Vacaville, CA: Who Installed the Most Systems in 2025
Utility records show 1,027 home solar systems connected in Vacaville in 2025. Sunrun Installation Services Inc was the installer of record on 391 of them, followed by Ambrose Solar (133) and Citadel Roofing and Solar (88). The table lists each company's CSLB license number. It is a count from public records, not a ranking or endorsement: check each license and get at least three quotes.
California Rate Relief is a private solar referral service.
Key facts
- Permit time
- About 1 to 3 business days
- Symbium instant review, per the City
- City of Vacavillechecked Sep 23, 2026
- Fallback filing
- e-TRAKiT
- Solar, Solar with ESS or ESS Only Residential OL
- City of Vacavillechecked Sep 23, 2026
Installers who connected the most home solar systems in Vacaville in 2025
| Installer (name as reported) | Systems in 2025 | Jan 2024 to May 2026 | CSLB license |
|---|---|---|---|
| Sunrun Installation Services Inc | 391 | 658 | 750184 check |
| Ambrose Solar | 133 | 266 | 979872 check |
| Citadel Roofing and Solar | 88 | 145 | 647149 check |
| Complete Solar Inc | 58 | 59 | 961988 check |
| Better Earth Electric Inc | 39 | 53 | 1024460 check |
| Bright Ops | 34 | 94 | 1020761 check |
| Tesla Energy Operations Inc | 28 | 60 | 888104 check |
| North Valley LLC | 21 | 57 | 1080746 check |
Counts from utility records, not a ranking or endorsement. Check each license's status and complaint history on the CSLB's Check a License page (checked Sept. 24, 2026).
Source: California Distributed Generation Statistics (CPUC), Interconnected Project Sites data set, data through May 31, 2026 (checked Sept. 24, 2026).
Home solar in Vacaville by the numbers
PG&E approved 1,027 home solar systems in Vacaville in 2025, from 83 installers; the top three were named on 60% of them. The busiest year since 2021 was 2022, with 1,565 (2025: -34%). Another 429 were approved from January through May 2026.
2025 mix: 38% leased or on a power purchase agreement, 62% owned by the household; 40% with a battery; median size 5.67 kW DC. Solano County: 49% leased or PPA, 50% with a battery, median 5.64 kW.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Systems connected | 1,151 | 1,565 | 1,383 | 743 | 1,027 |
Hiring a solar company in Vacaville
A solar company installing in Vacaville gets the permit through the City's Symbium portal, which the City says takes about one to three business days, or files in e-TRAKiT if the design does not qualify. Vacaville is PG&E territory, and MCE, which serves several neighboring Solano County cities, does not list Vacaville as a member. Compare at least three written bids built on your own PG&E bill.
Start with your Vacaville electricity bill
Vacaville is PG&E territory. MCE serves Benicia, Fairfield, Vallejo and unincorporated Solano County, but its own list of member communities does not include Vacaville, even though an older Energy Commission layer shades the area as MCE's. Read the generation line on your PG&E bill; unless it names another provider, PG&E supplies both generation and delivery, and PG&E's Solar Billing Plan sets what new exports earn.
Vacaville's two permit paths
Vacaville partnered with Symbium to meet Senate Bill 379. Contractors and homeowners apply for instantaneous plan review in the Symbium portal after confirming the address is within city limits, and the City says permit processing takes about one to three business days, depending on staff availability. A design the platform disqualifies is not stuck: it can still be submitted electronically through e-TRAKiT under one of three permit types, Solar Residential OL, Solar with ESS Residential OL, or ESS Only Residential OL for a battery added on its own.
Ask each bidder which of those four routes it expects your job to take. A bid that assumes the instant path for a design with storage or unusual electrical work may be promising a timeline the City does not.
PG&E, not a community choice provider
Much of Solano County gets generation from MCE, whose list of member communities names Benicia, Fairfield, Vallejo and unincorporated Solano County. Vacaville is not on that list. The Energy Commission's community choice layer, last updated in August 2025, shades Vacaville as MCE territory, so a quick map lookup can mislead; the provider's own list and your bill are the better guide.
For a PG&E customer, a new system goes on PG&E's Solar Billing Plan. PG&E enrolls residential solar customers in its Electric Home time-of-use rate, credits exports at values that vary by time of day, day of the week and season, and sends monthly statements plus an annual true-up. Ask each bidder which hours its model assumes you export in, since that sets what the exports are worth.
What a Vacaville quote needs to explain
| Check | Ask each bidder |
|---|---|
| Generation provider | Confirm from your bill whether PG&E supplies generation, and model PG&E's Solar Billing Plan for a new system. |
| Permit path | State whether the job uses Symbium's instant review or e-TRAKiT, and which permit type. |
| Battery | Price storage separately and say whether it changes the permit type to Solar with ESS. |
| Contract and service | Name the contracting business, its CSLB license and who handles service calls. |
A comparison to ask for
If one Vacaville bid includes a battery and another does not, they may be on different permit paths. Ask each bidder whether its design passes Symbium's instant review or goes to e-TRAKiT, and what that does to the timeline, then compare the prices only after both answers are in writing.
Verify the company behind the Vacaville quote
Match the business name and license number on each Vacaville proposal to the CSLB record, then use our contractor verification steps, the quote comparison guide and the PPA, loan, lease and cash comparison.
Permit fees and the filing route are on the Vacaville solar cost and permit page.
Vacaville solar quote questions
How long does a solar permit take in Vacaville?
The City says permits processed through its Symbium instant-review portal take about one to three business days, depending on staff availability. Projects that do not qualify are filed in e-TRAKiT instead.
Is Vacaville in MCE's service area?
MCE's own list of 38 member communities includes Benicia, Fairfield, Vallejo and unincorporated Solano County but not Vacaville. Check the generation line on your PG&E bill.
How do I find a solar company in Vacaville?
Check each company's CSLB license, confirm it will file through the City's Symbium portal or e-TRAKiT, and compare at least three written bids built on your own PG&E bill. This page does not rank installers.
Before you sign anything in Vacaville
Two of the contract terms that most often change what a quote really costs.
Ask for a competing quote
Start with the utility on your bill and what you pay in a typical month. Contact details come after that. Submitting does not guarantee that a provider will quote your project.
California Rate Relief is a referral service. We are not a licensed contractor. California Rate Relief is compensated by a solar provider when a homeowner we refer signs an agreement. How we make money
Before you send anything
- What this is
- California Rate Relief is a private referral service. It is not a contractor, does not install or finance anything, and is not a utility, a government agency or an assistance program.
- What happens after the form
- Your project details are recorded for referral to a solar provider. The provider decides whether it can help and what it can offer; availability, design and price are determined after its own review.
- How you are contacted
- Read the consent wording before submitting. Your inquiry includes contact details for follow-up about the project; a provider decides whether it can serve it.
- Using the site without submitting
- The calculators, bill comparisons and checklists on this site work without contact details, and nothing on this page requires a submission.